IKA
®
-WERKE
24
5 Operating mechanisms on the machine
This machine is delivered without a control panel
6 Placing the ULTRA-TURRAX
in operation
See also chapter 12
6.1 Connecting the machine
After setting up the machine on a safe surface the machine is connected to the
power supply.
When connecting pipes it may be advisable to install a bellows expansion joint in the
pipe.
6.2 Short test
During a short test run check again:
•
The machine has to be filled up with liquid (at least water) that the single-acting
mechanical seal is moistened and cannot run dry.
•
The direction the motor is turning, according to arrow on the ventilator unit
•
Listen for unusual mechanical noises
Caution
The mechanical seal may not run dry, i.e. the machine
must always be filled with sufficient medium to provide
lubrication and cooling of the sliding rings.
Otherwise, the mechanical seal might be damaged.
Содержание 06-5819
Страница 1: ...IKA WERKE Reg No 4343 01 IKA ULTRA TURRAX UTL 1000 10 Serial No 06 5819 OPERATING INSTRUCTIONS EN ...
Страница 2: ...IKA WERKE 2 ...
Страница 5: ...IKA WERKE 3 ...
Страница 36: ...IKA WERKE 34 ...
Страница 40: ...IKA WERKE 38 12 Assembly drawing ...
Страница 41: ...IKA WERKE 39 12 1Detail 1 of assembly drawing ...
Страница 42: ...IKA WERKE 40 12 2Detail 2 of assembly drawing only with option base frame ...
Страница 43: ...IKA WERKE 41 13 Dimension sheet ...
Страница 46: ...IKA WERKE 44 ...