6. Assembly and hydraulic installation
Installation instructions iPump A 2-7, 3-11
34
assembly and hydraulic installation
SL-Modul
6. Assembly and hydraulic installation
6.1. Assembly of the indoor unit
iPump A heat pumps must be installed in a frost-
protected room by an approved specialist. The room
temperature must be between 5°C and 25°C.
If the minimum size of the installation room falls below
the required value, the room must be designed as an
machine room according to EN 378.
It is not permissible to install the equipment in humid
or dusty rooms, where there is a risk of explosion.
For maintenance work a gap of 600 mm must be
observed at the front and depending of the connection
of the refrigerant pipes, on the right or left side of the
heat pump (see the opposite diagram).
The connection for the circulation line is located on
the front side of the storage tank, behind the electrical
tub. This must be folded downwards for installation.
The connections for the refrigerant lines are either on
the right or on left side.
The connections for heating
fl
ow and return
fl
ow are
on the top, also the connections for cold- and hot wa-
ter and the circulation. The connections are described
on page 9.
The relevant laws, regulations and standards must be
observed, in particular EN 378 parts 1 and 2 as well
as BGR 500.
min. 600mm
min. 600mm
750mm
600mm
View from above
Incorrect fl ow rates due to incorrect pi-
ping, incorrect fi ttings or improper pump
operation can cause damages!
Connection circulation line