![iDM AERO SLM 3-11 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/idm/aero-slm-3-11/aero-slm-3-11_technical-documentation-installation-instructions_3721219032.webp)
(C) IDM ENERGIESYSTEME GMBH
5. Assembly and hydraulic installation
Installation instructions AERO SLM
32
assembly and hydraulic installation
Au
ße
nluft
einh
eit
5.8. Condensation r un-of f
Special measures must be taken for the condensation
that occures. It must be guaranteed in any case that
it is properly carried away or drained. The installed
heating band must be layed into the condensate run-
o
ff
line.
5.9. Connection of condensation r un-of f
The enclosed corrugated hose (1,5 m) must be
fi
xated
with the enclosed pipe clamp on the condensation
run-o
ff
adapter. The heating band (2 m) will be placed
in the drain hose. The condensation bin and the run-
o
ff
have to be checked for soiling regularly
Outdoor device
Well/Pipe
300mm
Canalisation
Condensate flow
companing heating system
Concrete base
min. 200 mm
800 mm
5.10. Minimum distances
When installing the outdoor unit, there must be spe-
cial attention to avoid air
fl
ow short circuit. Note by
assembly, that no air-bypass will develop between
the suction side and exhaust side. So it‘s not allowed
that the outdoor device is enclosed by 4 walls, so the
duct inlet or the duct outlet must be independent.
min. 600 mm
min. 500 mm
min. 500 mm
Exhaust side
Suction side
barrier
barrier
barrier
The minimum distances must be maintained due to perform maintenance.