5.6. Assembling of the outdoor unit on con-
crete base
The outdoor unit will be installed on the concrete
base without vibration dampers. See page 8, scope
of delivery AERO SLM outdoor unit.
Procedure:
The drill holes will be placed according the distances
as described on page 30.
The installation of the anchors and the handling of
the two-component composite mortar is according to
the assembly instruction of the manufacturer of the
composite mortar. After the anchors are glued in and
the glue is cured, the hexagon-nuts and the washers
will be mounted on the threaded bars. After this, the
outdoor unit will be placed and brought into the correct
position. At the end the outdoor unit will be countered
and secured with the washers and the hexagon-nuts.
Mounting of the outdoor unit AERO SLM 3-11
5.7. Ear thing of heat pump system
If the protective conductor is correctly connected, the
control panel and the housing of the heat pump are
earthed. After maintenance work, make sure that the
equipotential bonding is properly restored. For the
outdoor unit, a 10 mm hole is provided for connecting
the equipotential bonding or lightning protection. The
hole is marked with a sticker and is located on the
base frame of the outdoor unit.
Connection for the equipotential bonding or lightning protection
AERO SLM 3-11
Mounting of the outdoor unit AERO SLM 6-17
Connection for the equipotential bonding or lightning protection
AERO SLM 6-17