
(C) IDM Energiesysteme GmbH
Installation instructions AERO ILM
39
Example of outlet side on the right
Installation
5.12.3.
$VVHPEO\LQVWUXFWLRQVÀH[LEOHDLUKRVHDLURXWOHWVLGHZD\V
Air inlet side
Procedure as in corner installation
Outlet panel:
The outlet panel is mounted to the desired side using
the 4 screws included in the delivery contents.
A trapeze-shaped insulation with adhesive tape on
both sides is included with the outlet panel. This has
WREHDႈ[HGWRWKHSDQHORQWKHHYDSRUDWRUVLGH
:DOOÀDQJH
7KH ZDOO ÀDQJH KDV WR EH PRXQWHG WR WKH DLU RXWOHW
opening using suitable assembly material. Four bore
KROHVLQWKHFRUQHUVRIWKHÀDQJHDUHSURYLGHGIRUWKDW
purpose!
Flexible hose:
The hose can be cut to length as desired! In connect-
LQJWKHKRVHZLWKWKHWZRÀDQJHVWKHKRVHLQVXODWLRQ
is telescoped at the two ends.
7KH KRVH LV PRXQWHG WR WKH ÀDQJH XVLQJ D KRVH
clamp. This enables the insulation to be extended
RYHUWKHÀDQJHDJDLQ
7KH DLU KRVH LV ÀH[LEOH DQG HQDEOHV DQ RXWOHW LQ DOO
directions. The minimum bending radius is 600 mm!!
The air hose should be straight as far as
possible and should not make any un-
necessary changes in direction . The air
hose should be suspended every 0.5 m
with an assembly tape (perforated tape)!
The heat pump must only be moved us-
ing the mounted panels!