
(C) IDM Energiesysteme GmbH
5. General description
Installation instructions AERO ILM
32
Installation
5.10.2. Mounting of straight air duct
Air intake side same as the corner installation.
7KH DLUGXFW KDV D PRXQWLQJ ÀDQJH RQ ERWK VLGHV
2Q RQH VLGH WKLV LV PRXQWHG ¿[ 2Q WKH RWKHU VLGH
WKH ÀDQJH LV VXSSOLHG ORRVH ,I QHFHVVDU\ WKH GXFW
FDQEHFXWWROHQJWK$IWHUZDUGVWKHÀDQJHKDVWREH
mounted on the duct again.
On the heat pump side, the duct, together with the
exhaust panel, is mounted in the frame of the heat
pump by the 4 supplied screws.
2Q WKH RWKHU VLGH WKH DLU GXFW KDV WR EH ÀDQJHG
together with the 4 supplied screws to the duct wall
connection piece.
$VVKRZQLQWKHSLFWXUHEHORZWKHÀDQJHFRQQHFWLRQ
(duct wall connection) lies in front of the wall. At the
RWKHUHQGRIWKHGXFWZDOOFRQQHFWLRQLVDOVRDÀDQJH
which ensures the stability of the wall socket.
7KLV ÀDQJH VKRXOG OLH GLUHFWO\ LQ WKH ZDOO RSHQLQJ
After the duct is installed, it must be insulated with
the supplied insulation. Then the wall connection duct
LV¿OOHGZLWKFOHDQDQGDLUWLJKWIRDP
special foam
to seal
air duct
wall connection
duct
Weather-
shield grille
On the outside of the wall, the weather shield grille
(or mesh grille) is mounted directly to the insulation
of the wall opening by means of the provided dowels.
Finally, the foamed area of the wall breakthrough
must be covered with the panel
insulation