
(C) IDM Energiesysteme GmbH
5. General description
Installation instructions AERO ILM
24
Installation
The following shall be taken into account:
•
2FFXUULQJREVWUXFWLRQVDQGWKHLUHႇHFW
•
2EMHFWUHÀHFWLRQV
•
*URXQGUHÀHFWLRQV
•
Absorption caused by plants
•
(ႇHFWRIZLQGDQGWHPSHUDWXUHOD\HUV
10m
10m
5m
5m
5.6. Decoupling of buildings
If vibrations of the heat pump are transmitted via
ÀRRUVFHLOLQJVZDOOVRURWKHUVROLGVWKLVLVUHIHUUHGWR
as structure-borne noise. In order to minimize this in,
heat pumps should be decoupled from the structure
in so far as possible. The installation of heat pumps
RQFHLOLQJVRUÀRRUVLQOLJKWZHLJKWFRQVWUXFWLRQVKRXOG
EH SULQFLSDOO\ DYRLGHG ,Q WKH FDVH RI ÀRDWLQJ ÀRRU
VFUHHGWKHÀRRUVFUHHGDQGLPSDFWVRXQGLQVXODWLRQ
should be omitted around the heat pump (as shown
in the illustration).
1
2
3
4
5
1. Betondecke
2. Trittschalldä
mm
ung
3. Estrich
4. Ausneh
m
ung
5. Schalldä
mmm
atte
To the heat pump are enclosed two sound insulation
PDWV,IWKHKHDWSXPSLVDWWKH¿QDOLQVWDOODWLRQVLWH
the mats must be placed under the heat pump. For
this purpose, the four feet can be adjusted in height.
view from above
adjustable
feet of the
heat pump