Optia HE -
Installation & Servicing
19
INSTALLATION
SIDE FLUE OUTLET
cla7712
1
2
4
3
5
The optional side outlet kit is required
for all side flue applications.
An optional flue duct extension kit is
required for lengths (distance from the
outside wall to the relevant side of the
boiler casing) greater than 775mm (30
1/2"). Refer to Frame 10.
20 FLUE ASSEMBLY - Exploded view
For wall thickness 270mm to 775mm
IMPORTANT.
Ensure that, during the cutting operation,
masonry falling outside of the building does not cause
damage or personal injury.
1.
Cut the flue hole, preferably with a 125mm (5") core boring
tool, ensuring that the hole is square to the wall. If the hole
has been accurately cut with a drill then making good the
inner wall face is not essential as a seal is provided (an
optional extra outer wall seal is required if necessary).
However, both wall faces immediately around the cut hole
should be flat; make good if necessary. For less accurate
holes make good to approximately 125mm (5") diameter at
the 2 wall faces.
2.
Drill 3 holes, 2 for the wall mounting plate and 1 for the
jacking screw with an 8mm (5/16") masonry drill.
21 WALL MOUNTING TEMPLATE
Note.
The template shows the positions for the fixing holes and the flue
hole centres for standard installation.
If the flow and return pipes are to be routed down behind the boiler the
downward routing pipe bracket, supplied with the Downward Piping Kit,
must be used. This bracket is secured to the wall and it is essential to
use only those holes as shown on the wall mounting template.
Care MUST be taken to ensure the correct holes are drilled.
1.
Tape the template into the selected position.
2.
Ensure squareness by hanging a plumb line as shown.
3.
Extend the flue centre line onto the side wall and measure in
120mm for standard installation or 156mm when using
downward routing pipe kit.
4.
Mark onto the wall the following:
a.
The 2 wall mounting plate screw positions (choose one from
each group).
b.
The fixing hole for the jacking screw.
c.
The position of the flue duct hole.
Note.
Mark the centre of the hole as well as the circumference.
5.
Remove template from the wall.
cla8182
3
Extended
centre line
156mm
120mm
With downward routing pipe kit
Standard Installation
cla7666
LEGEND
1.
Terminal
2.
External weather seal (optional)
3.
Internal weather seal (optional)
4.
Flue assembly
5.
Side outlet kit (Optional)
22 PREPARING THE WALL
201962-6.pmd
19/02/2008, 15:10
19
Содержание Optia HE 9
Страница 2: ...2 Optia HE Installation Servicing...