background image

Optia HE - 

Installation & Servicing

17

INSTALLATION

REAR FLUE OUTLET

14 CUTTING THE FLUE 

 - 

wall thicknesses of 75 to 705mm

1.

Measure and note the wall thickness X (Refer to Frame 10).

2.

Mark the wall thickness onto the flue.

3.

To ensure the tube is cut square, mark the flue all the way
round.

4.

Position the inner flue spring to support the inner flue during the
cutting process.

5.

Cut to length X, (refer to Frame 10).

6.

Remove any burrs and remove the inner flue support ring.

15 FITTING THE FLUE CONNECTING RING AND THE BOILER SEALING RING TO THE FLUE

1.

Remove the two fan electrical connections, the red
pressure sensing pipe, the blue CO/CO

2

 sensing

pipe and the two fan fixing screws.

2.

Pull the fan forward, remove and retain.

3.

Remove the two fixing screws retaining the
removable top section of the aluminium
recuperator and carefully lift the recuperator top
section from the main body.

5.

If using the flue finishing kit, push the black outer
wall seal over the outer flue duct (Refer to Frame
16) prior to fitting the flue ring. Fit the boiler sealing
ring inside the terminal 'B' pack outer flue duct.
Ensure the boiler sealing ring is fully engaged.
Ensure the notch aligns with the label on the outer
flue duct.  This ensures correct alignment of the flue
terminal.

6.

Drill 3 holes 3.2mm (1/8") dia. through the outer flue
duct and boiler sealing ring. 

Do NOT drill the inner

flue duct.

7.

Insert the self-tapping screws, provided, in order to
fix the boiler sealing ring in position.

8.

Stick the self-adhesive foam
strip, provided in the boiler
hardware pack, onto the flue
immediately behind the boiler
sealing ring.

cla7841

Note. 

If the downward piping kit bracket is to be used, it is

essential that 30mm is added to the measured wall thickness
when marking the flue.

4.

Fit the 'O' ring to the flue extension ring and fit
the flue extension ring (to be found in the
boiler hardware pack) to the rear of the
recuperator top section using the three M4 x
10 taptite screws and form C washers also to
be found in the boiler hardware pack.

4

3

cla7662

5

Fixing

screws

Electrical
connections

Air pressure switch &

CO/CO

2

 sensing pipes

1

201962-6.pmd

19/02/2008, 15:10

17

Содержание Optia HE 9

Страница 1: ...oiler Optia HE High Efficiency Boilers Installation Servicing Instructions See reverse for Optia HE Users Guide Manufactured exclusively for Wolseley UK by Ideal Boilers For details of document amendm...

Страница 2: ...2 Optia HE Installation Servicing...

Страница 3: ...s 39 40 Condensate Pipe Termination Configurations BS6798 recommends that a second trap and an air break are required where the siphon trap within the boiler is less than 75mm for configuration 2 and...

Страница 4: ...he gross C V of the gas Btu ft3 Table 1 General Data The value is used in the UK Government s Standard Assessment Procedure SAP for energy rating of dwellings The test data from which it has been calc...

Страница 5: ...Helpline on the back page Page Burner operating pressure measure and record Central heating flow temp measure and record Central heating return temp measure and record For combination boilers only Sc...

Страница 6: ...stered Installer It must be carried out in accordance with the relevant requirements of the Gas Safety Installation and Use Regulations The appropriate Building Regulations either The Building Regulat...

Страница 7: ...core boring tool is to be used inside the building the space in which the boiler is to be installed must be at least wide enough to accommodate the tool Front clearance 450mm 17 3 4 from the front of...

Страница 8: ...ccordance with the recommendations of BS 5440 1 2000 In IE refer to I S 813 2002 The following notes are intended for general guidance 1 The boiler MUST be installed so that the terminal is exposed to...

Страница 9: ...al heating nor are they suitable for the provision of gravity domestic hot water The hot water cylinder and ancillary pipework not forming part of the useful heating surface should be lagged to preven...

Страница 10: ...ir gap and a MINIMUM depth of water below the static water level cold of 75mm 2 The static water level cold must be at least 200mm above the top of the horizontal flow pipe fitted as shown The vent co...

Страница 11: ...overing at least the range 0 4 bar 0 60 lb in2 must be fitted to the system The gauge should be easily seen from the filling point and should preferably be connected at the same point as the expansion...

Страница 12: ...automatic air vent connected between them the stop valve being located between the system and the automatic air vent The stop valve may remain open during normal operation of the system if automatic...

Страница 13: ...view LEGEND 24 30 27 35 9 12 19 37 26 23 17 Data Plate Condensate siphon trap cla7880 9 Sightglass 12 Main Burner 17 Gas Valve 19 Control Box 23 PCB25E 24 Air pressure switch 26 Controls Casing 27 Flu...

Страница 14: ...off 8 UNPACKING Pack A Contents A The complete boiler B Installation Servicing User s Instructions C Hardware Pack listed below Hardware Pack 1 Contents A Pipe Flue extension 1 off B Nut Siphon 1 off...

Страница 15: ...ion ducts plus the standard flue duct may be used together 2 Flue extensions of greater than 1m 39 should be supported with the bracket provided 90o Elbow kit equivalent flue length resistance 1 5m 45...

Страница 16: ...wall mounting plate screw positions choose one from each group Note Mark the centre of the flue hole as well as the circumference b The position of the flue duct hole c The jacking screw fixing hole...

Страница 17: ...e outer flue duct Refer to Frame 16 prior to fitting the flue ring Fit the boiler sealing ring inside the terminal B pack outer flue duct Ensure the boiler sealing ring is fully engaged Ensure the not...

Страница 18: ...the bottom packaging protection 3 Check the boiler alignment using a spirit level and adjust as necessary with the jacking screw 4 Line up the hole in the jacking screw with the hole in the wall prev...

Страница 19: ...ew with an 8mm 5 16 masonry drill 21 WALL MOUNTING TEMPLATE Note The template shows the positions for the fixing holes and the flue hole centres for standard installation If the flow and return pipes...

Страница 20: ...e the tube is cut square mark the flue all the way round 4 Cut to length and remove any burrs 24 FITTING THE FLUE ASSEMBLY 1 Insert the flue assembly through the hole 2 Ensure the flue terminal is in...

Страница 21: ...switch sensing pipe and CO CO2 sensing pipe 8 Lift the boiler onto the wall mounting bracket 9 Remove the bottom packaging protection 10 Check the boiler alignment to the wall using a spirit level and...

Страница 22: ...the flue all the way around 6 De burr the cut edges 29 FLUE EXTENSION DUCTS continued 28 FLUE EXTENSION DUCTS For flue lengths greater than 705mm rear flue or 775mm side flue Flue duct support Wall p...

Страница 23: ...is is achieved by using either Flat roof weather collar or Universal weather collar ACCESSORIES Flue Duct Extension Kits are available for flue lengths extending beyond 1m These packs contain 1m exten...

Страница 24: ...N 610 mm min ex7531 610 mm min ex7532 The terminal should be positioned so that products of combustion can safely disperse at all times Pluming may occur at the termination so where possible terminal...

Страница 25: ...to 7 5 Push fit the vertical connector E supplied separately into the boiler flue connection and retain with the four securing screws provided 6 Push fit extension duct F if required supplied separat...

Страница 26: ...27 The routing of the drain must be made to allow a minimum fall of 1 in 20 away from the boiler throughout its length The drainage pipework must be arranged so that obstruction e g through freezing o...

Страница 27: ...oviding it can be confirmed that the down pipe is part of a combined waste and rain water system Make connection to SVP using a solvent welded saddle BOILER External wall Ground Level Termination to S...

Страница 28: ...O heat thermostat Thermostat sensor L br br L On Off switch ALL EARTHS must be connected Not all earths are shown for clarity Air pressure switch Flue protection thermostat cla7856 Combined spark sens...

Страница 29: ...facturer 3 This is a fully controlled system set the boiler thermostat to maximum 4 Switchmaster Midi is similar in operation but the wiring differs slightly see the manufacturer s literature 43 PICTO...

Страница 30: ...left off for more than a day or so then a frost thermostat should be wired into the system This is usually done at the programmer in which case the programme selector switches are set to OFF and all...

Страница 31: ...button J 7 Switch the electricity supply ON and check that all external controls are calling for heat 48 INITIAL LIGHTING 8 Set the boiler thermostat knob D to position 6 and the boiler Mains On Off...

Страница 32: ...2 10 Stress the importance of regular servicing by a CORGI registered installer and that a comprehensive service should be carried out AT LEAST ONCE A YEAR In IE servicing work must be carried out by...

Страница 33: ...elow and be repeated to ensure even clamping 1 Remove the screw retaining the front burner support strap to the combustion chamber Remove the M5 pozi situated at the LH bottom rear of the burner and p...

Страница 34: ...is correct refer to Frame 67 Clean or renew as necessary Note The pilot shield is located around the pilot assembly bracket and is located by the electrode retaining nut 57 CLEANING THE RECUPERATOR 1...

Страница 35: ...seal Do NOT overtighten 5 Replace the boiler front panel Refer to Frame 49 59 REASSEMBLY 62 SIGHTGLASS REPLACEMENT Reassemble the boiler in the following order 1 Refit the flue baffles 2 Inspect the...

Страница 36: ...hanger pocket and unclip from the casing 7 Remove the strain relief bush from the back panel base 8 Remove the sensor lead through the grommet in the control box 9 Replace and reassemble in reverse or...

Страница 37: ...Check the spark gap 7 Reassemble in reverse order 8 Check the operation of the boiler 9 The pilot is factory set to maximum and no further adjustment is possible Ensure there is an inlet pressure of 2...

Страница 38: ...justment sealing 1 Refer to Frame 61 2 Remove the burner and air box assembly Refer to Frame 54 3 Remove the electrode retaining nut 4 Remove the pilot shield 5 Remove the ignition electrode and integ...

Страница 39: ...electrical connections from the APS 5 Fit the new APS and reassemble in reverse order 6 Check the operation of the boiler 73 PRINTED CIRCUIT BOARD PCB REPLACEMENT 1 Refer to Frame 61 2 Remove the cont...

Страница 40: ...emove the fan collector hood assembly refer to Frame 55 Pull off the electrical connections from the overheat thermostat and pull off the white rubber tube from the siphon blockage sensing pipe 6 a Re...

Страница 41: ...sump connecting pipe and the blockage sensing pipe 5 Unscrew the siphon union connection 6 Remove the two siphon retaining screws and remove siphon 7 Re fit the new siphon and gasket and reassemble i...

Страница 42: ...on the fan connector at PCB Molex marked FAN YES YES NO NO Check the polarity of the mains supply Check the continuity of the ignition lead from connector to electrode Does the spark now cease when g...

Страница 43: ...6 HE15 1 174 067 HE18 1 174 068 35 Front Panel Assembly Kit 1 174 069 37 Control Door Kit 1 173 572 39 Casing Seal and Screws Kit 1 174 070 45 E83 682 Overheat Thermostat LM7 Kit 1 171 950 59 E97 310...

Страница 44: ...44 Optia HE Installation Servicing SHORT LIST OF PARTS 78 SHORT PARTS LIST 12 30 35 19 9 24 17 18 23 FUSE 37 39 26 27 15 14 13 13 A 45 59 cla7873...

Страница 45: ...ocal Authority Building Control LABC who will arrange an inspection or contact a government approved inspector LABC will record the data and will issue a certificate of compliance If you notify via CO...

Страница 46: ...HAT TYPE OF SCALE REDUCER HAS BEEN FITTED FOR THE DOMESTIC HOT WATER MODE MEASURE RECORD GAS RATE ft3 hr MAXIMUM BURNER OPERATING PRESSURE IF APPLICABLE mbar COLD WATER INLET TEMPERATURE o C HOT WATER...

Страница 47: ...ARD SERIAL No COMMENTS SIGNATURE SERVICE 3 DATE ENGINEER NAME COMPANY NAME TEL No CORGI ID CARD SERIAL No COMMENTS SIGNATURE SERVICE 4 DATE ENGINEER NAME COMPANY NAME TEL No CORGI ID CARD SERIAL No CO...

Страница 48: ...Optia HE Installer Technical Helpline 0870 8498057 The code of practice for the installation commissioning servicing of central heating systems...

Отзывы: