22
Mexico Super RS485 - RS4125 -
Installation & Servicing
INSTALLATION
28 GENERAL CHECKS
Make the following checks for correct operation:
1.
Turn the boiler thermostat OFF and ON to check that the
main burner is extinguished and relit in response.
2.
Check that the programmer, if fitted, and all other system
controls function correctly.
Operate each control separately and check that the main
burner or circulating pump (as the case may be)
responds.
3. Water circulation System
a.
With the system HOT, examine all water connections
for soundness.
b.
With the system still hot, turn off the gas, water and
electricity supplies to the boiler and drain down, in
order to complete the flushing process.
c.
Refill and vent the system, clear all air locks and again
check for water soundness.
d.
Balance the system.
4.
Finally, set the controls to the user's requirements, refit the
lower front panel and close the controls door.
1.
Hand the User's Instructions to the householder and explain
his or her responsibilities under the current Gas Safety
(Installation and Use) Regulations or rules in force.
2.
Draw attention to the lighting instruction label affixed to the
inside of the controls door.
3.
Explain and demonstrate the lighting and shutting down
procedures.
4.
The operation of the boiler and the use and adjustment of
ALL system controls should be fully explained to the
householder, to ensure the greatest possible fuel economy
consistent with household requirements of both heating and
hot water consumption.
Advise the User of the precautions necessary to prevent
damage to the system and to the building in the event of the
system remaining inoperative during frosty conditions.
5.
Explain the function and the use of the boiler thermostat and
external controls.
29 HANDING OVER
After completing the installation and commissioning of the system the
installer should hand over to the householder by the following actions:
6.
Explain and demonstrate the function of time and
temperature controls, radiator valves etc., for the economic
use of the system.
7.
If an optional Programmer Kit is fitted then draw attention to
the Programmer Kit User's Instructions and hand them to
the householder.
8. After installation, commissioning and customer hand-
over please complete the
appliance log book
and leave this with the customer.
For IE, it is necessary
to complete a "Declaration of Conformity" to indicate
compliance to I.S. 813:2002.
9.
Stress the importance of regular servicing by a CORGI
registered installer and that a comprehensive service
should be carried out AT LEAST ONCE A YEAR. In IE
servicing work must be carried out by a Competent Person.
Thermostat
Flow Temperature
Knob Setting
o
C
o
F
2
60
140
3
66
150
4
71
160
5
77
170
6
82
180
Notes.
!
!
!
!
!
If an optional programmer kit is fitted refer to the
separate Programmer Kit Installation Instructions and
Programmer Kit User's Instructions.
!
!
!
!
!
The temperatures quoted below are approximate and
vary between installations.
WARNING.
The boiler must not be operated with the casing removed
INST
ALLA
TION
200942-1.p65
3/4/2004, 9:25 AM
22