Harrier GT Range
- Installation
37
ASSEMBLY
• The Burner control circuit is fitted with 2 standard European connector-plugs and can be fitted directly to the burners, fitted
with connector-sockets. In the case of a burner not fitted with sockets, remove the plugs on the burner cable from the boiler
and connect the leads to the terminal bar on the burner, proceeding as follows:
No (9) [1] Control circuit phase interrupted in panel by safety Thermostat TS, Limit Thermostat TS and panel ON/OFF switch ZG.
Connect to control circuit live terminal burner.
NOTE: The connection terminal for this control phase must be separate from those of the power supply phase(s)
which are wired direct to the burner via the installer supplied burner mains relay.
No (8) [N] Neutral from control panel interrupted by panel ON/OFF switch. Connect to Neutral terminal of burner control box.
No (7) T1 Live feed from burner control circuit downstream of burner ON/OFF switch. Connect to live side of first stage
control thermostat (High temperature setting).
No (6) T2 Return from 1st stage control thermostat (High temperature setting). Live on this lead, hence on T2 allows burner to
fire on low fire in a 2 stage burner.
No (10)S3 Burner lock indicator. Feeds signal from lockout terminal on burner control box to lock out indicator on boiler
control panel.
No (4) B4 Feed to 1st stage operating indicator from burner low fire control. Indicates low fire in operation. Essentially feed
back from live on No (6) T2.
No (2) T6 Live feed from burner control circuit downstream of burner ON/OFF switch. Connects to live side of 2nd stage
control thermostat (Low setting thermostat).
No (3) T8 Return from 2nd stage control thermostat (low temperature setting). Live on this lead, hence on T8 allows burner to
fire on high fire in a 2 stage burner.
No (5) T7 Back contact from 2nd stage control thermostat (low temperature setting). Live on this lead, hence T7 indicates
high fire out of operation (used for modulating burners only).
No (1) B5 Feed to 2nd stage operating indicator from burner high fire control to boiler panel. Indicates high fire in operation.
Essentially feed back from live on No (3) T8.
g/y
Earth.
DELUXE CONTROL PANEL BURNER CONNECTION
Содержание Harrier GT
Страница 38: ...38 Harrier GT Range Installation NOTES ...
Страница 39: ...Harrier GT Range Installation 39 NOTES ...