pipe according to the pipe length parameter in this manual.
Emptying or vacuum
Before charging the refrigerant to the system, to ensure that there is no impurities, water or
non-condensable gas. So, emptying and vacuum operation should be carried out.
◇
Vacuum: when process this operation please be sure that the connection pipe is tightened up.
1. Screw off the cover of maintenance valve connection, connect the pressure gauge to the connection of
maintenance valve
2. Connect the vacuum pump to the pressure gauge, turn on the vacuum pump and pressure gauge to
process the vacuum operation toward the indoor unit and piping, while to ensure that the absolute
pressure is no less than 50Pa after this operation.
3. Turn off the pressure gauge and vacuum pump to keep the pressure in the same level in 20 minutes.
◇
Emptying: when process this operation, please disconnect the high pressure valve with liquid valve.
1. Connect the gas valve of the stop valve to the thimble side of the rubber hoses, the other side of rubber
hoses should be connected to the refrigerant tank.
2. Open the refrigerant tank valve, using the refrigerant inside the tank with high speed to empty the air in
the indoor unit and the connection piping. When the outlet air becomes mist (it feels cold by touching it),
then the air is emptied.
3. When ensure that the air is emptied, connect and tighten the high pressure valve of outdoor unit stop
valve and liquid side connection pipe, keep this state more than 10 seconds.
4. Use soapy what to test each connection junctions (including lengthen piping welding junction)
5. Confirmed that there is no leakage, turn off the valve of refrigerant tank, take down the rubber hose as
well.
◇
Turn on the high-low pressure valve of the outdoor unit.
After vacuum and emptying, screw back the cover of the maintenance valve of outdoor unit low pressure
valve, screw off the high-low pressure valve of the outdoor unit (note: shall totally turned off ). Connect the
refrigerant to the system.
Содержание ICC(ICA)-**HR-SA6-NI
Страница 1: ......
Страница 3: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ...21 ...
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ...50 ...
Страница 51: ...54 ...
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 67: ...540 760 111 539 257 287 322 130 300 326 590 800 540 4 10 19 370 ...
Страница 68: ...130 370 4 10 19 540 800 690 326 300 606 332 400 354 11 71 903 857 ...
Страница 69: ...148 1255 180 945 413 373 4 10 19 585 340 ...
Страница 72: ...152 ...
Страница 73: ......
Страница 74: ......
Страница 75: ...155 Introduction of Control Board QRD SW3F HCE1 outdoor unit board sockets Power supply 380V 415V ...
Страница 104: ...186 7 Failure analysis Wired controller communication failure ...
Страница 105: ...187 Communication failure between indoor and outdoor unit ...
Страница 106: ...188 Outdoor protection phase sequence ...
Страница 107: ...189 Cooling high pressure protection ...
Страница 108: ...190 Heating high pressure protection ...
Страница 109: ...191 Cooling low pressure protection ...
Страница 110: ...192 Heating low pressure protection ...
Страница 111: ...193 Cooling exhaust temperature protection ...
Страница 112: ...194 Heating exhaust temperature protection ...
Страница 113: ...195 Refrigerant shortage or four way valve failure protection ...
Страница 114: ...196 Sensor failure protection ...
Страница 115: ...197 No action after power on ...
Страница 116: ...198 Poor effect ...
Страница 117: ...199 ...
Страница 118: ...200 Abnormal sound or viberation ...
Страница 119: ...201 ...
Страница 120: ...202 Abnormal odor ...
Страница 121: ...203 Air switch action when air conditioner starting up ...
Страница 122: ...204 Air conditioner water leakage ...