![ICS Schneider Messtechnik GA35 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/ics-schneider-messtechnik/ga35/ga35_operating-instructions-manual_3533856014.webp)
14
EN
5. Commissioning
5. Commissioning
Personnel:
skilled electrical personnel
5.1 Requirements for the installation location
Hang the emission monitor on a vertical and even wall.
Provide sufficient space around the instrument so that cables and hose connections can
be connected.
5.2 Wallmounting
Required tools
3 screws (4 x 70 mm)
3 dowels (6)
1 drill (6 mm)
1 screwdriver
1. Select the installation location.
→ See chapter 5.1 “Requirements for the installation location”.
2. Mount the hanging screw on the wall.
→ For the position of the hanger, see the following figure “Drilling drawing”.
3. Open the terminal box.
4. Hang on the wall with the hanger.
5. Align the instrument.
6. Mark the drilling holes.
7. Take the instrument down.
8. Drill the holes and fit the dowels into them.
9. Rehang the instrument.
10. Screw the instrument on.
For stone walls, the bore holes always have to be provided with dowels.