
ICP DAS PMC/PMD Series User Manual
72
and click on “Move Down” to move the group to lower order
(lower index number (No.)).
Copy
:
To copy the settings of a pre-set group to the new
group, please click the radio button in front of the pre-set
group and then click on “Copy”, a new group (in sequence)
will be added to the list and the settings of the old group will
be copied to this newly added group.
Remove
:
Click the radio button in front of the group and
click on “Remove” to remove the selected group.
Close
:
Click the “Close” button to return to group setting
page.
6.8.4
Setup the loops/phases of the subgroup
i
Click the “Set up” button (
) of subgroup to open the setting
window.
Figure6-32 :
Loops/Phases of subgroup Setting
ii
Select the loop/phase of the power meter and click
to add this
loop/phase to the lists. Click “Close” button to return to group
setting page.
Содержание PMC series
Страница 1: ...ICP DAS PMC PMD Power Meter Concentrator Series User Manual Version 3 1 8...
Страница 51: ...ICP DAS PMC PMD Series User Manual 38 Figure5 32 Energy Usage Breakdown by Circuit Group Chart...
Страница 72: ...ICP DAS PMC PMD Series User Manual 59 Figure6 11 Security setting interface of VPN function...
Страница 165: ...ICP DAS PMC PMD Series User Manual 152 The Import of MQTT Topic...
Страница 315: ...ICP DAS PMC PMD Series User Manual 302 B Start the DCON Utility and verify if the COM Port parameters are accurate...