7.0 INSTALLATION
–
TRANSFER HOT WATER CIRCULATION
7.1 Function switch setting
–
TRANSFER HOT WATER CIRCULATION
Installers can set the function switch to meet different applications. Before setting the function switch, the control panel should
be disconnected from the power supply.
After completing the setting, apply power to the control panel and observe the application sign displayed on the LCD conforming
to the TRANSFER symbol.
TRANSFER SETTING FOR
TRANSFER SYMBOL
HOT WATER CIRCULATION
MCB
Содержание DPC3
Страница 1: ...BIA DPC3 rev 5 Page 1 Installation and Operation Manual DPC3 ...
Страница 23: ...BIA DPC3 rev 5 Page 23 3 2 3 Drainage by liquid level control through float switches or probes cont ...
Страница 30: ...BIA DPC3 rev 5 Page 30 5 2 2 Water supply by pressure control through pressure switch and tank cont ...
Страница 31: ...BIA DPC3 rev 5 Page 31 5 2 3 Water supply by pressure control through pressure switch and tank cont ...
Страница 35: ...BIA DPC3 rev 5 Page 35 6 2 2 Water supply by liquid level control through float switches or probes cont ...
Страница 45: ...BIA DPC3 rev 5 Page 45 ...
Страница 46: ...BIA DPC3 rev 5 Page 46 ...