BIA-DPC1 rev 4
Page 9
2.2 Function switch setting - DRAINAGE
Installers can set the function switch to meet different applications. Before setting the function
switch, the control panel should be disconnected from the power supply.
After completing the setting, apply power to the control panel and observe the application sign
displayed on the LCD conforming to the DRAINAGE symbol.
DRAINAGE SETTING
DRAINAGE SYMBOL
SWITCHES DOWN
MCB
Содержание DPC1
Страница 1: ...BIA DPC1 rev 4 Page 1 Installation and Operation Manual DPC1...
Страница 13: ...BIA DPC1 rev 4 Page 13 2 5 1 Drainage by liquid level control through float switches or probes cont...
Страница 24: ...BIA DPC1 rev 4 Page 24 3 5 1 Water supply by pressure control through pressure switch and tank cont...
Страница 25: ...BIA DPC1 rev 4 Page 25 3 5 1 Water supply by pressure control through pressure switch and tank cont...
Страница 31: ...BIA DPC1 rev 4 Page 31 4 5 1 Water supply by liquid level control through float switches or probes cont...
Страница 43: ...BIA DPC1 rev 4 Page 43...
Страница 44: ...BIA DPC1 rev 4 Page 44...