BIA-DPC1 rev 4
Page 20
3.0
Installation
–
BOOSTING
3.1
Electrical connection to the power supply and pump
DANGER. Electric shock risk.
Before carrying out any installation or maintenance operation, the control panel should be disconnected from
the power supply and one should wait at least 2 minutes before opening the control panel.
Never connect AC power to output L and N terminals.
Ensure the motor, controller and power specifications match.
The electrical and hydraulic connections must be carried out by competent, skilled, qualified personnel.
Main Circuit Breaker
Содержание DPC1
Страница 1: ...BIA DPC1 rev 4 Page 1 Installation and Operation Manual DPC1...
Страница 13: ...BIA DPC1 rev 4 Page 13 2 5 1 Drainage by liquid level control through float switches or probes cont...
Страница 24: ...BIA DPC1 rev 4 Page 24 3 5 1 Water supply by pressure control through pressure switch and tank cont...
Страница 25: ...BIA DPC1 rev 4 Page 25 3 5 1 Water supply by pressure control through pressure switch and tank cont...
Страница 31: ...BIA DPC1 rev 4 Page 31 4 5 1 Water supply by liquid level control through float switches or probes cont...
Страница 43: ...BIA DPC1 rev 4 Page 43...
Страница 44: ...BIA DPC1 rev 4 Page 44...