2
INDEX
1
INTRODUCTION ........................................................................................................................................ 3
2
SAFETY WARNINGS ................................................................................................................................ 3
3
GENERAL WARNINGS ............................................................................................................................. 6
4
TECHNICAL SPECIFICATIONS ............................................................................................................... 7
4.1
GREENOX.E 10 ÷ 70 BOILER ............................................................................................................ 7
4.2
GREENOX.E 80 ÷ 300 BOILER .......................................................................................................... 9
4.3
GREENOX BT COND BOILER ......................................................................................................... 11
5
INSTALLATION ....................................................................................................................................... 12
5.1
THERMAL PLANT ............................................................................................................................ 12
5.1.1
ROOM BOILER .......................................................................................................................... 12
5.1.2
FLUE .......................................................................................................................................... 12
5.2
HYDRAULIC CONNECTION ............................................................................................................ 13
5.2.1
SEALED HOT WATER HEATING SYSTEM WITH EXPANSION VESSEL .............................. 13
5.3
ELECTRICAL CONNECTION ........................................................................................................... 14
5.4
OPTIONAL CONTROL PANEL ......................................................................................................... 14
5.5
INSTALLATION OF GREENOX.E 80 ÷ 300 BOILER CONTROL PANEL ....................................... 15
5.6
DOOR ................................................................................................................................................ 17
5.6.1
DOOR OPENING ....................................................................................................................... 17
5.6.2
DOOR OPENING REVERSAL (TO THE RIGHT) ..................................................................... 17
5.6.3
DOOR ADJUSTMENT (OPENING ON THE RIGHT) ................................................................ 18
5.7
BURNER CONNECTION .................................................................................................................. 19
6
ASSEMBLY .............................................................................................................................................. 20
6.1
BOILER CASINGS AND CONTROL PANEL .................................................................................... 20
7
START UP ................................................................................................................................................ 24
7.1
PRELIMINARY CHECKS .................................................................................................................. 24
7.2
WATER TREATMENT ...................................................................................................................... 24
7.3
FILLING THE SYSTEM ..................................................................................................................... 24
8
OPERATION ............................................................................................................................................ 25
8.1
OPERATING CHECKS ..................................................................................................................... 25
9
MAINTENANCE ....................................................................................................................................... 27
9.1
PREPARATION FOR INSPECTION AND MAINTENANCE ............................................................. 27
9.2
ORDINARY ....................................................................................................................................... 28
10
QR Code .................................................................................................................................................. 29
Содержание GREENOx.e Series
Страница 31: ......