87
WARRANTY POLICY
I.C.E. Inc warrants all components in new machines to be free of defects in materials and workmanship for the
period listed below:
■ 180 days on Main PCB’s, Computers & Motors
■ 1 year on all LCD monitor panels
■ 90 days on all other electronic and mechanical components
■ 30 days on all I.C.E. repairs and parts purchases
I.C.E. Inc shall not be obligated to furnish a warranty request under the following conditions:
■ Equipment or parts have failed through normal wear and tear
■ Equipment has been subjected to unwarranted stress, abuse or neglect
■ Equipment has been damaged as a result of arbitrary repair/modification
Products will only be covered under warranty by obtaining an I.C.E. authorized RMA #. To obtain an RMA #
please provide I.C.E. tech support with the game serial # or original I.C.E. invoice # and a detailed description
of the failure or fault symptoms.
I.C.E. Inc will assume no liability whatsoever for costs associated with labor or travel time to replace defective
parts. All defective warranty covered components will be replaced with new or factory refurbished compo-
nents equal to OEM specifications.
I.C.E. Inc will cover domestic UPS ground, or comparable shipping costs during the warranty period. Interna-
tional or expedited shipments are available for an additional charge. To obtain credit defective parts must be
returned to I.C.E. Inc, at the customer’s expense, within 30 days. After 30 days a 15% re-stocking fee will ap-
ply to all returns.
ICE distributors are independent, privately owned and operated. In their judgment, they may sell parts and/or
accessories other than those manufactured by I.C.E. Inc. We cannot be responsible for the quality, suitability
or safety of any non-I.C.E. part or modification (including labor) that is performed by such a distributor.
Innovative Concepts in Entertainment
10123 Main St.
Clarence, NY 14031
Phone #: (716)
-
759 –
0360
Fax #: (716) –
759
–
0884
Содержание DODGEBALL ULTIMATE ARENA
Страница 7: ...7 Assembly for Steps 1 8 Chapter 1 ...
Страница 14: ...14 STEP 7 Slide two 1S Joists into the two inner channels shown NO HARDWARE is used to secure them ...
Страница 16: ...16 Assembly for Steps 9 16 Chapter 2 ...
Страница 22: ...22 Assembly for Steps 17 22 Chapter 3 ...
Страница 28: ...28 Assembly for Steps 23 26 Chapter 4 ...
Страница 33: ...33 Assembly for Steps 27 43 Chapter 5 ...
Страница 43: ...43 Assembly for Steps 44 51 Chapter 6 ...
Страница 48: ...48 Assembly for Steps 52 59 Chapter 7 ...
Страница 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...
Страница 75: ...75 Tower Covers Part Numbers ...
Страница 76: ...76 DECAL PART NUMBERS ...
Страница 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...