42
STEP 43:
Loosely secure the 2K arch using two AA6125 Allen bolts and AA6212 washers from the backside
and secure them with AA6966 nylon nuts at the front on both sides.
DO NOT TIGHTEN AT THIS TIME.
X’s 4
AA6212 1/4 X 3/4
black washer
AA6966 1/4-20
nylock black nut
AA6125 1/4-20 X 2-1/2
black Allen
Cages Assembled
STEP 42:
Slide the back 2K roof arch into the back legs.
2K
Содержание DODGEBALL ULTIMATE ARENA
Страница 7: ...7 Assembly for Steps 1 8 Chapter 1 ...
Страница 14: ...14 STEP 7 Slide two 1S Joists into the two inner channels shown NO HARDWARE is used to secure them ...
Страница 16: ...16 Assembly for Steps 9 16 Chapter 2 ...
Страница 22: ...22 Assembly for Steps 17 22 Chapter 3 ...
Страница 28: ...28 Assembly for Steps 23 26 Chapter 4 ...
Страница 33: ...33 Assembly for Steps 27 43 Chapter 5 ...
Страница 43: ...43 Assembly for Steps 44 51 Chapter 6 ...
Страница 48: ...48 Assembly for Steps 52 59 Chapter 7 ...
Страница 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...
Страница 75: ...75 Tower Covers Part Numbers ...
Страница 76: ...76 DECAL PART NUMBERS ...
Страница 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...