STEP 17:
Lay the (2C) left and (2D) right Towers on their backs. At the bottom of the (2C) left tower should be
one network cord and two DC connections (one small, one large). Carefully pull them out and
ensure no damage has been done to the network cable. At the bottom of the (2D) right tower should
be two network cords and two DC connections (one small, one large). Carefully pull them out and
ensure no damage has been done to the network cables. It might be possible that the network
cables can “catch” on internal wiring inside the towers. Wiggle the cable up, down, back and fourth
until it is free.
Содержание DODGEBALL ULTIMATE ARENA
Страница 7: ...7 Assembly for Steps 1 8 Chapter 1 ...
Страница 14: ...14 STEP 7 Slide two 1S Joists into the two inner channels shown NO HARDWARE is used to secure them ...
Страница 16: ...16 Assembly for Steps 9 16 Chapter 2 ...
Страница 22: ...22 Assembly for Steps 17 22 Chapter 3 ...
Страница 28: ...28 Assembly for Steps 23 26 Chapter 4 ...
Страница 33: ...33 Assembly for Steps 27 43 Chapter 5 ...
Страница 43: ...43 Assembly for Steps 44 51 Chapter 6 ...
Страница 48: ...48 Assembly for Steps 52 59 Chapter 7 ...
Страница 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...
Страница 75: ...75 Tower Covers Part Numbers ...
Страница 76: ...76 DECAL PART NUMBERS ...
Страница 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...