STEP 19:
Install the 2M and 2N lower panel covers to both score towers using three AA6004
each.
USE A SCREW DRIVER or lower Torq setting.
These covers must remain removal for future service.
AA6004 - 8-32 X 1/2
X’s 3
STEP 20:
Lay the 2A left and 2B right inner towers on their backs. Both towers should have one network cord
and one DC connection (one large). Carefully pull them out and ensure no damage has been done
to the network cables. It might be possible that the network cables can “catch” on internal wiring
inside the towers. Wiggle the cable up, down, back and fourth until it is free.
2M or 2N
Содержание DODGEBALL ULTIMATE ARENA
Страница 7: ...7 Assembly for Steps 1 8 Chapter 1 ...
Страница 14: ...14 STEP 7 Slide two 1S Joists into the two inner channels shown NO HARDWARE is used to secure them ...
Страница 16: ...16 Assembly for Steps 9 16 Chapter 2 ...
Страница 22: ...22 Assembly for Steps 17 22 Chapter 3 ...
Страница 28: ...28 Assembly for Steps 23 26 Chapter 4 ...
Страница 33: ...33 Assembly for Steps 27 43 Chapter 5 ...
Страница 43: ...43 Assembly for Steps 44 51 Chapter 6 ...
Страница 48: ...48 Assembly for Steps 52 59 Chapter 7 ...
Страница 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...
Страница 75: ...75 Tower Covers Part Numbers ...
Страница 76: ...76 DECAL PART NUMBERS ...
Страница 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...