18
STEP 9:
Slide the power sub-floor (1E) into the rear channels.
Align the tabs into the slots. WATCH YOUR FINGERS!
AA6212 1/4 X 3/4
black washer
STEP 10:
Secure the power sub-floor (1E) using two AA6584 black Allen bolts and AA6212 black washers.
NOTE: Although all efforts we made to ensure quality in parts, before
installing this panel, inspect the panel for damage to wiring or mounting
holes not fully cleaned out.
X’s 2
AA6584 1/4-20 X 2 black Allen
Содержание DODGEBALL ULTIMATE ARENA
Страница 7: ...7 Assembly for Steps 1 8 Chapter 1 ...
Страница 14: ...14 STEP 7 Slide two 1S Joists into the two inner channels shown NO HARDWARE is used to secure them ...
Страница 16: ...16 Assembly for Steps 9 16 Chapter 2 ...
Страница 22: ...22 Assembly for Steps 17 22 Chapter 3 ...
Страница 28: ...28 Assembly for Steps 23 26 Chapter 4 ...
Страница 33: ...33 Assembly for Steps 27 43 Chapter 5 ...
Страница 43: ...43 Assembly for Steps 44 51 Chapter 6 ...
Страница 48: ...48 Assembly for Steps 52 59 Chapter 7 ...
Страница 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...
Страница 75: ...75 Tower Covers Part Numbers ...
Страница 76: ...76 DECAL PART NUMBERS ...
Страница 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...