27
STEP 21:
Position 2A inner tower to the left and 2B
inner tower to the right at the back of the
cabinet. Align the hole at the bottom of the
towers with the holes already at the back.
STEP 22:
Secure each of the inner towers using four AA6584 black Allen bolts and AA6212 black washers.
Do not install tower covers at this time.
AA6212 1/4 X 3/4 FLAT
WASHER BLACK
AA6584 1/4-20 X 2 (BLACK)
X’s 4
T-Molding goes to the bottom!
Towers Assembled
Содержание DODGEBALL ULTIMATE ARENA
Страница 7: ...7 Assembly for Steps 1 8 Chapter 1 ...
Страница 14: ...14 STEP 7 Slide two 1S Joists into the two inner channels shown NO HARDWARE is used to secure them ...
Страница 16: ...16 Assembly for Steps 9 16 Chapter 2 ...
Страница 22: ...22 Assembly for Steps 17 22 Chapter 3 ...
Страница 28: ...28 Assembly for Steps 23 26 Chapter 4 ...
Страница 33: ...33 Assembly for Steps 27 43 Chapter 5 ...
Страница 43: ...43 Assembly for Steps 44 51 Chapter 6 ...
Страница 48: ...48 Assembly for Steps 52 59 Chapter 7 ...
Страница 53: ...53 STEP 57 Tower harnesses Insert cables from each tower assembly into the bottom holes B ...
Страница 75: ...75 Tower Covers Part Numbers ...
Страница 76: ...76 DECAL PART NUMBERS ...
Страница 82: ...82 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator ...