46
•
Power on for 8 hours before starting.
Parts replacement
Replacing parts should use the parts provided by the manufacturer, do not replace with 3rd party
parts.
Refrigerating system
The system is factory charged with refrigerant. If the refrigerant charge is found to be low, evacuate the
charge and check for leaks.
A.
If repair welding is needed, the system must be drained of gas before welding
.
Connect the vacuum tube to the low-pressure side refrigerant injection nozzle
.
Vacuum the system line with vacuum pump, vacuum for more than 3 hours, confirm that the multi-
meter indicating pressure in the specified range
.
B.
Replenish the refrigerant.
A
fter reaching the desired vacuum limit and holding it for 3-hours or more, the system can be
charged with refrigerant. The appropriate refrigerant filling amount has been indicated on the
nameplate and in the main technical parameters table.
The charging amount of refrigerant will be affected by the ambient temperature. If the required
charging amount is not reached and cannot be recharged, the water can be circulated and the unit
can be started for charging. If necessary, the low-voltage control switch can be temporarily short-
circuited
.
Slowly fill the system with refrigerant and check the suction and exhaust pressure.
Warning: Do not inject oxygen, acetylene or other flammable or toxic gases into the refrigeration
system during leak detection and air tightness test. Only high-pressure nitrogen or
refrigerant can be used
.
Disassemble compressor
If the compressor needs to be removed, please follow the following steps
:
•
Turn off the unit power supply.
•
Remove the compressor power connector.
•
Remove compressor suction and exhaust pipe.
•
Disconnect the compressor retaining bolt.
•
Move the compressor.
Auxiliary electric heater
Air-source heat pump capacity will derate when the ambient temperature drops. Be sure to reference the
performance data when selecting equipment. For areas that experience temperatures below 5°F for
extended times, the outlet temperature may drop below 140°F. Secondary electric heaters can be used to
either boost temperature or supplement the load to counteract the derate in performance caused by low
Содержание ccHPWH Series
Страница 11: ...8 III Product specification 1 Dimensions Unit inch ccHPWH275 S ccHPWH275 D ...
Страница 12: ...9 ccHPWH550 S ccHPWH550 D ...
Страница 26: ...23 2 Wiring diagram ccHPWH275 S ccHPWH275 D ...
Страница 27: ...24 ccHPWH550 S ccHPWH550 D ...
Страница 42: ...39 Schematic diagram of control wiring and code dialing of each module ...