Clustered gateway installation checklist
About this task
The checklist below provides a high-level overview of the tasks required to
successfully install the TS7650G in a clustered gateway configuration. If you are
installing a stand-alone gateway, use the “Stand-alone gateway installation
checklist” on page 23.
Important:
This document references IBM 4.8 TB Fibre Channel Disk Controllers and IBM 7.2
TB Fibre Channel Disk Expansion Units in many of the hardware installation
figures, examples, and procedures.
In addition to the IBM DS4700 disk controller, the TS7650G also supports the
DS5000 disk controller, the DS8000 disk controller and the XIV disk controller, as
well as various non-IBM storage solutions. If the customer has elected to use disk
storage components other than the IBM disk controllers mentioned above, the
figures, examples, and procedures in this document will not apply to the
configuration on which you are working. Therefore, it is suggested that you
determine the make and model of the disk storage components in use and, if
necessary, obtain the related product documentation before you begin installation
of the gateway.
The RAS code no longer sends call home packages for problems with any of the
disk storage products attached to the gateway including DS4700. DS5000, DS8000
and XIV.
Table 7. Clustered gateway installation checklist
U
Task
Description
Where to find information
Section 1: Perform pre-installation verification
h
1–1
The disk components are installed in suitable
frames.
If this task was not completed prior to your
arrival, refer to “Read this first” on page 17
and “Disk storage configuration guidelines” on
page 18.
h
1–2
The frames are in a suitable location.
N/A
h
1–3
The disk controllers are located within 25m (82
ft.) cable length of the server(s).
N/A
h
1–4
All RAID, logical drive, and LUN configuration
is completed.
Customer
If these tasks were not completed prior to your
arrival, refer to “Read this first” on page 17
and “Disk storage configuration guidelines” on
page 18.
h
1–5a
For VTL, three IP addresses were assigned for
use:
v
One for 3958-DD4 Server A
v
One for 3958-DD4 Server B
v
One for the TSSC
Customer
26
IBM System Storage TS7600 with ProtecTIER: Installation Roadmap Guide
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
Содержание System Storage TS7650G 3958 DD4
Страница 2: ......
Страница 7: ...Russia Electromagnetic Interference EMI Class A Statement 189 Index 191 Contents v...
Страница 8: ...vi IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 10: ...viii IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 12: ...x IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 16: ...xiv IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 30: ...xxviii IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 38: ...xxxvi IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 44: ...6 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 46: ...8 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 54: ...16 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 89: ...Figure 20 Clustered TS7650G power cabling Chapter 4 Installing the TS7650G hardware 51...
Страница 120: ...82 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 148: ...110 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 150: ...112 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 156: ...118 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 172: ...134 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 192: ...154 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 198: ...160 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 210: ...172 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 220: ...182 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 228: ...190 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Страница 231: ......
Страница 232: ...Part Number 46X6052 Printed in USA or Mexico GC53 1154 09 1P P N 46X6052...