Table 15. Host fibre channel connections for stand-alone VTL configuration
Label
From
To
Remarks
1
DD4A S1 1
HOST 1
2
DD4A S1 2
HOST 2
3
DD4A S2 1
HOST 3
4
DD4A S2 2
HOST 4
Procedure
1.
Connect fibre channel cables according to Table 14 on page 45 and Table 15.
Note:
The customer must use an additional connectivity device between the
optical fibre directly connected to RMSS optical adapters (for example, Fibre,
ESCON, or FICON) and an external public network. It can be a patch panel,
router, switch, or other suitable device. Optical fibre connectivity that does not
go over a public network does not require an additional connectivity device.
2.
Use Figure 17 on page 44 to verify that the recommended disk components are
cabled correctly. (Connections to the customer's host network not shown in this
figure).
3.
Make any necessary adjustments to cable labeling or placement, then go to
“Powering-up the components” on page 69.
Figure 18. Host fibre channel connections for stand-alone VTL
46
IBM System Storage TS7600 with ProtecTIER: Installation Roadmap Guide
Содержание System Storage TS7600 ProtecTIER Series
Страница 2: ......
Страница 7: ...Russia Electromagnetic Interference EMI Class A Statement 189 Index 191 Contents v ...
Страница 8: ...vi IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 10: ...viii IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 12: ...x IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 16: ...xiv IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 30: ...xxviii IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 38: ...xxxvi IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 44: ...6 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 46: ...8 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 54: ...16 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 89: ...Figure 20 Clustered TS7650G power cabling Chapter 4 Installing the TS7650G hardware 51 ...
Страница 120: ...82 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 148: ...110 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 150: ...112 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 156: ...118 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 172: ...134 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 192: ...154 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 198: ...160 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 210: ...172 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 220: ...182 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 228: ...190 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide ...
Страница 231: ......
Страница 232: ... Part Number 46X6052 Printed in USA or Mexico GC53 1154 09 1P P N 46X6052 ...