
Interpreting
POST
results
POST
is
a
system
check
that
is
performed
each
time
the
router
is
powered
on,
rebooted,
or
reset,
and
during
which
the
LEDs
flash
different
colors.
To
determine
whether
POST
completed
successfully
and
whether
any
errors
were
detected:
v
Verify
that
the
LEDs
on
the
router
indicate
that
all
components
are
healthy
(LED
patterns
are
described
in
the
tables
in
“Interpreting
LED
activity”
on
page
30).
If
one
or
more
LEDs
do
not
display
a
healthy
state:
–
Verify
that
the
LEDs
are
not
set
to
"beacon"
(this
can
be
determined
through
the
switchShow
command
or
Web
Tools).
For
information
about
how
to
turn
beaconing
on
and
off,
see
the
Fabric
OS
Administrator's
Guide
or
the
Web
Tools
Administrator's
Guide
.
–
Follow
the
recommended
action
for
the
observed
LED
behavior,
as
listed
in
the
tables
in
“Interpreting
LED
activity”
on
page
30.
v
Verify
that
diagShow
command
displays
that
the
diagnostic
status
for
all
ports
in
the
router
is
OK.
v
Review
the
system
log
for
errors.
Errors
detected
during
POST
are
written
to
the
system
log,
which
is
viewed
using
the
errShow
command.
For
more
information
about
this
command,
see
the
Fabric
OS
Command
Reference
.
For
information
about
specific
error
messages,
see
the
Fabric
OS
Error
Message
Reference
.
POST
and
boot
specifications
The
router
runs
POST
by
default
each
time
it
is
powered
on.
It
typically
requires
from
1
to
3
minutes
to
boot
and
complete
POST.
POST
can
be
skipped
after
subsequent
reboots
by
entering
the
fastBoot
command.
For
more
information
about
this
command,
see
the
Fabric
OS
Command
Reference
Manual
.
POST
The
success/fail
results
of
the
diagnostic
tests
that
run
during
POST
can
be
monitored
through
LED
activity,
the
error
log,
or
a
command
line
interface.
POST
includes
the
following
tasks:
1.
Running
preliminary
POST
diagnostics
2.
Initializing
the
operating
system
3.
Initializing
the
hardware
4.
Running
diagnostic
tests
on
several
functions,
including
circuitry,
port
functionality,
memory,
statistics
counters,
and
serialization
Boot
In
addition
to
POST,
boot
includes
the
following
tasks
after
POST
is
complete:
1.
Performing
universal
port
configuration
2.
Initializing
links
3.
Analyzing
the
fabric.
If
any
ports
are
connected
to
other
switches,
the
router
participates
in
a
fabric
configuration.
4.
Obtaining
a
domain
ID
and
assigning
port
addresses
5.
Constructing
unicast
routing
tables
6.
Enabling
normal
port
operation
36
SAN04B-R
Installation,
Service,
and
User’s
Guide
Содержание SAN04B-R - System Storage Router
Страница 2: ......
Страница 8: ...vi SAN04B R Installation Service and User s Guide ...
Страница 12: ...x SAN04B R Installation Service and User s Guide ...
Страница 14: ...xii SAN04B R Installation Service and User s Guide ...
Страница 16: ...xiv SAN04B R Installation Service and User s Guide ...
Страница 36: ...8 SAN04B R Installation Service and User s Guide ...
Страница 84: ...56 SAN04B R Installation Service and User s Guide ...
Страница 101: ......
Страница 102: ... Part Number 45W1697 Printed in USA GA32 0583 01 1P P N 45W1697 ...