Chapter 5. Rack planning
137
The IBM 1U Pass Through Bracket is shown in Figure 5-13. The front for the
component has brushes to block the airflow around any cables that are passed
through it. It can also serve to block air flow around a switch that is recessed in
the rack (for cable routing reasons), that pass around a blank filler panel.
Figure 5-13 1U filler with brushes, allows cables through but blocks air flow
M6 screws
(x4)
M6 Cage nut
(x4)
M6 Clip nut
(x4)
Pass through
bracket
Содержание NeXtScale System
Страница 2: ......
Страница 16: ...xiv IBM NeXtScale System Planning and Implementation Guide...
Страница 26: ...8 IBM NeXtScale System Planning and Implementation Guide...
Страница 132: ...114 IBM NeXtScale System Planning and Implementation Guide...
Страница 263: ...0 5 spine 0 475 0 875 250 459 pages IBM NeXtScale System Planning and Implementation Guide...
Страница 264: ......
Страница 265: ......