Chapter 3. Starting the server
19
Note:
After turning off the server, wait at least 5 seconds before pressing
the Power Control button to power the server on again.
— You can press and hold the Power Control button for more than 4 seconds to
cause an immediate shutdown of the server and place the server in standby
mode. You can use this feature if the operating system stalls.
— You can disconnect the server power cords from the electrical outlets to shut
off all power to the server.
Note:
Wait about 15 seconds after disconnecting the power cords for your
system to stop running. Watch for the System Power light on the
operator information panel to stop blinking.
Information LED panel:
The lights on this panel give status information for
your server. See “Information LED panel”.
Statement 5
CAUTION:
The power control button on the device and the power supply do not turn off
the electrical current supplied to the device. The device also might have more
than one power cord. To remove all electrical current from the device, ensure
that all power cords are disconnected from the power source.
1
2
3
Содержание Netfinity 7100
Страница 1: ...IBM IBM Netfinity 7600 Installation Guide SC09 N821 60 ...
Страница 4: ...IBM Netfinity 7600 Installation Guide ...
Страница 9: ...ix Statement 4 18 kg 37 lbs 32 kg 70 5 lbs 55 kg 121 2 lbs CAUTION Use safe practices when lifting ...
Страница 15: ...Chapter 1 Introduction 5 Microprocessor Terminator card Memory module Shuttle I O board Memory board ...
Страница 16: ...6 IBM Netfinity 7600 Installation Guide ...
Страница 40: ...30 IBM Netfinity 7600 Installation Guide Troubleshooting chart ...
Страница 56: ...46 IBM Netfinity 7600 Installation Guide ...
Страница 58: ...48 IBM Netfinity 7600 Installation Guide ...
Страница 59: ......