Chapter 2. Implementation planning
47
To additionally increase the storage pool to hold archive data as well, follow
these steps:
1. Using Table 2-1 on page 18 and the GB copied per archive field, group all
machines that require simultaneous archive operations during one common
time frame (for example, every month). Select the biggest group, giving peak
archive size.
2. Take 10% of the peak archive size, giving the archive storage size.
For example, using the sample figures in Table 2-1 on page 18:
1. Assuming a monthly/month-end time frame as our baseline, we have the
workstations (200 GB) and database servers (80 GB), which equals 280 GB.
2. Taking 10% from all archive storage required during the time frame, 280 GB *
0.10 = 28 GB for archive disk storage.
2.8.11 Image disk sizing
If you are planning to use image backups, you should consider sizing the disk
storage pool to hold the file spaces you want to back up. This is because image
backups are single objects and therefore the server will require that size for
storing data (or at least part of it, assuming compression is enabled).
For example, assuming that the client file spaces eligible for image backup are
/oralog (200 MB), /finsys (1.5 GB), /oradata (1 GB), and /findata (1 GB), then the
disk image requirements should be at least 3.7 GB to hold those file spaces in
disk without having to use tape immediately. This is especially true if you are
running parallel backup operations (that is, executing multiple concurrent backup
image commands). Alternatively, since the disk storage requirements are so high
for this operation, you could consider sending these backups straight to tape,
provided that you have enough tape drives and the backup window is longe
enough to coexist with normal backup and archive operations as well.
We recommend that the disk storage pools be allocated on fault-tolerant
hardware devices such as RAID 5 devices. If you are using hardware or
operating system mirroring, you need to plan for the mirror copy by doubling the
amount of disk for the primary storage pool.
Various file systems have different maximum capacities, so the primary storage
pool may have to be split across numerous volumes to make up your total
primary storage pool size. We recommend that the disk storage pools be placed
Note: You must sum up all disk storage requirements (backup, archive, image)
to have your final disk storage size. You can, of course, start with smaller
numbers and evaluate future growth.
Содержание E16RMLL-I - Tivoli Storage Manager
Страница 2: ......
Страница 23: ...Figures xxi 22 6 AIX lab environment 708...
Страница 24: ...xxii IBM Tivoli Storage Manager Implementation Guide...
Страница 32: ...2 IBM Tivoli Storage Manager Implementation Guide...
Страница 44: ...14 IBM Tivoli Storage Manager Implementation Guide...
Страница 94: ...64 IBM Tivoli Storage Manager Implementation Guide...
Страница 96: ...66 IBM Tivoli Storage Manager Implementation Guide...
Страница 126: ...96 IBM Tivoli Storage Manager Implementation Guide...
Страница 298: ...268 IBM Tivoli Storage Manager Implementation Guide...
Страница 354: ...324 IBM Tivoli Storage Manager Implementation Guide...
Страница 356: ...326 IBM Tivoli Storage Manager Implementation Guide...
Страница 423: ...Chapter 12 Scheduling 393 Week of Month Expire Never tsm quit...
Страница 424: ...394 IBM Tivoli Storage Manager Implementation Guide...
Страница 510: ...480 IBM Tivoli Storage Manager Implementation Guide...
Страница 552: ...522 IBM Tivoli Storage Manager Implementation Guide...
Страница 554: ...524 IBM Tivoli Storage Manager Implementation Guide...
Страница 594: ...564 IBM Tivoli Storage Manager Implementation Guide...
Страница 612: ...582 IBM Tivoli Storage Manager Implementation Guide...
Страница 618: ...588 IBM Tivoli Storage Manager Implementation Guide...
Страница 720: ...690 IBM Tivoli Storage Manager Implementation Guide...
Страница 752: ...722 IBM Tivoli Storage Manager Implementation Guide...
Страница 758: ...728 IBM Tivoli Storage Manager Implementation Guide...
Страница 780: ...750 IBM Tivoli Storage Manager Implementation Guide...
Страница 802: ...772 IBM Tivoli Storage Manager Implementation Guide...
Страница 823: ...Index 793 Z z OS tape management 58 zOS 200...
Страница 824: ...794 IBM Tivoli Storage Manager Implementation Guide...
Страница 825: ...IBM Tivoli Storage Manager Implementation Guide...
Страница 826: ......
Страница 827: ......