background image

v

   

Use

 

only

 

approved

 

tools

 

and

 

test

 

equipment.

 

Some

 

hand

 

tools

 

have

 

handles

 

that

 

are

 

covered

 

with

 

a

 

soft

 

material

 

that

 

does

 

not

 

provide

 

insulation

 

from

 

live

 

electrical

 

current.

 

v

   

Regularly

 

inspect

 

and

 

maintain

 

your

 

electrical

 

hand

 

tools

 

for

 

safe

 

operational

 

condition.

 

Do

 

not

 

use

 

worn

 

or

 

broken

 

tools

 

or

 

testers.

 

v

   

Do

 

not

 

touch

 

the

 

reflective

 

surface

 

of

 

a

 

dental

 

mirror

 

to

 

a

 

live

 

electrical

 

circuit.

 

The

 

surface

 

is

 

conductive

 

and

 

can

 

cause

 

personal

 

injury

 

or

 

equipment

 

damage

 

if

 

it

 

touches

 

a

 

live

 

electrical

 

circuit.

 

v

   

Some

 

rubber

 

floor

 

mats

 

contain

 

small

 

conductive

 

fibers

 

to

 

decrease

 

electrostatic

 

discharge.

 

Do

 

not

 

use

 

this

 

type

 

of

 

mat

 

to

 

protect

 

yourself

 

from

 

electrical

 

shock.

 

v

   

Do

 

not

 

work

 

alone

 

under

 

hazardous

 

conditions

 

or

 

near

 

equipment

 

that

 

has

 

hazardous

 

voltages.

 

v

   

Locate

 

the

 

emergency

 

power-off

 

(EPO)

 

switch,

 

disconnecting

 

switch,

 

or

 

electrical

 

outlet

 

so

 

that

 

you

 

can

 

turn

 

off

 

the

 

power

 

quickly

 

in

 

the

 

event

 

of

 

an

 

electrical

 

accident.

 

v

   

Disconnect

 

all

 

power

 

before

 

you

 

perform

 

a

 

mechanical

 

inspection,

 

work

 

near

 

power

 

supplies,

 

or

 

remove

 

or

 

install

 

main

 

units.

 

v

   

Before

 

you

 

work

 

on

 

the

 

equipment,

 

disconnect

 

the

 

power

 

cord.

 

If

 

you

 

cannot

 

disconnect

 

the

 

power

 

cord,

 

have

 

the

 

customer

 

power-off

 

the

 

wall

 

box

 

that

 

supplies

 

power

 

to

 

the

 

equipment

 

and

 

lock

 

the

 

wall

 

box

 

in

 

the

 

off

 

position.

 

v

   

Never

 

assume

 

that

 

power

 

has

 

been

 

disconnected

 

from

 

a

 

circuit.

 

Check

 

it

 

to

 

make

 

sure

 

that

 

it

 

has

 

been

 

disconnected.

 

v

 

If

 

you

 

have

 

to

 

work

 

on

 

equipment

 

that

 

has

 

exposed

 

electrical

 

circuits,

 

observe

 

the

 

following

 

precautions:

 

   

Make

 

sure

 

that

 

another

 

person

 

who

 

is

 

familiar

 

with

 

the

 

power-off

 

controls

 

is

 

near

 

you

 

and

 

is

 

available

 

to

 

turn

 

off

 

the

 

power

 

if

 

necessary.

 

   

When

 

you

 

are

 

working

 

with

 

powered-on

 

electrical

 

equipment,

 

use

 

only

 

one

 

hand.

 

Keep

 

the

 

other

 

hand

 

in

 

your

 

pocket

 

or

 

behind

 

your

 

back

 

to

 

avoid

 

creating

 

a

 

complete

 

circuit

 

that

 

could

 

cause

 

an

 

electrical

 

shock.

 

   

When

 

using

 

a

 

tester,

 

set

 

the

 

controls

 

correctly

 

and

 

use

 

the

 

approved

 

probe

 

leads

 

and

 

accessories

 

for

 

that

 

tester.

 

   

Stand

 

on

 

a

 

suitable

 

rubber

 

mat

 

to

 

insulate

 

you

 

from

 

grounds

 

such

 

as

 

metal

 

floor

 

strips

 

and

 

equipment

 

frames.

v

   

Use

 

extreme

 

care

 

when

 

measuring

 

high

 

voltages.

 

v

   

To

 

ensure

 

proper

 

grounding

 

of

 

components

 

such

 

as

 

power

 

supplies,

 

pumps,

 

blowers,

 

fans,

 

and

 

motor

 

generators,

 

do

 

not

 

service

 

these

 

components

 

outside

 

of

 

their

 

normal

 

operating

 

locations.

 

v

   

If

 

an

 

electrical

 

accident

 

occurs,

 

use

 

caution,

 

turn

 

off

 

the

 

power,

 

and

 

send

 

another

 

person

 

to

 

get

 

medical

 

aid.

Important:

  

All

 

caution

 

and

 

danger

 

statements

 

in

 

this

 

documentation

 

begin

 

with

 

a

 

number.

 

This

 

number

 

is

 

used

 

to

 

cross

 

reference

 

an

 

English

 

caution

 

or

 

danger

 

statement

 

with

 

translated

 

versions

 

of

 

the

 

caution

 

or

 

danger

 

statement

 

in

 

the

 

IBM

 

Safety

 

Information

 

book.

 

For

 

example,

 

if

 

a

 

caution

 

statement

 

begins

 

with

 

a

 

number

 

1,

 

translations

 

for

 

that

 

caution

 

statement

 

appear

 

in

 

the

 

IBM

 

Safety

 

Information

 

book

 

under

 

statement

 

1.

 

Be

 

sure

 

to

 

read

 

all

 

caution

 

and

 

danger

 

statements

 

in

 

this

 

documentation

 

before

 

performing

 

the

 

instructions.

 

Read

 

any

 

additional

 

 

Safety

 

ix

Содержание BladeCenter QS20

Страница 1: ...BladeCenter QS20 Type 0200 Problem Determination and Service Guide SC33 8297 00...

Страница 2: ......

Страница 3: ...BladeCenter QS20 Type 0200 Problem Determination and Service Guide SC33 8297 00...

Страница 4: ...age 65 and the Warranty and Support Information on the IBM BladeCenter Documentation CD First Edition September 2006 Copyright International Business Machines Corporation 2006 All rights reserved US G...

Страница 5: ...am in the Management Module 11 Why you should not install the blade server into blade bays 6 and 7 12 What happens if the blade server is accidentally installed into blade bays 6 and 7 12 Troubleshoot...

Страница 6: ...iniBand 48 Replacing the battery 55 Completing the installation 58 Installing the blade server bezel assembly 58 Closing the blade server cover 60 Input output connectors and devices 61 Appendix A Get...

Страница 7: ...18 September 1998 bzw der EMC EG Richtlinie 89 336 f r Ger te der Klasse A 72 European Union EMC Directive conformance statement 72 Taiwanese Class A warning statement 73 Japanese Voluntary Control C...

Страница 8: ...vi BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 9: ...lleert eerst de veiligheidsvoorschriften Ennen kuin asennat t m n tuotteen lue turvaohjeet kohdasta Safety Information Avant d installer ce produit lisez les consignes de s curit Vor der Installation...

Страница 10: ...ds such as loose or missing hardware To inspect the product for potential unsafe conditions complete the following steps 1 Make sure that the power is off and the power cord is disconnected 2 Make sur...

Страница 11: ...en disconnected v If you have to work on equipment that has exposed electrical circuits observe the following precautions Make sure that another person who is familiar with the power off controls is n...

Страница 12: ...safety information that comes with the blade server or optional device before you install the device x BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 13: ...quipment when there is evidence of fire water or structural damage v Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instruc...

Страница 14: ...ttery replace it only with the same module type made by the same manufacturer The battery contains lithium and can explode if not properly used handled or disposed of Do not v Throw or immerse into wa...

Страница 15: ...e device v Use of controls or adjustments or performance of procedures other than those specified herein might result in hazardous radiation exposure DANGER Some laser products contain an embedded Cla...

Страница 16: ...ice and the power switch on the power supply do not turn off the electrical current supplied to the device The device also might have more than one power cord To remove all electrical current from the...

Страница 17: ...act a service technician Statement 13 DANGER Overloading a branch circuit is potentially a fire hazard and a shock hazard under certain conditions To avoid these hazards ensure that your system electr...

Страница 18: ...handling ADVERTENCIA El contacto con el cable de este producto o con cables de accesorios que se venden junto con este producto pueden exponerle al plomo un elemento qu mico que en el estado de Califo...

Страница 19: ...ected correctly v The BladeCenter QS20 has the latest firmware update Related documentation In addition to this document the following documentation also comes with the server v Installation and User...

Страница 20: ...ices or data An attention notice is placed just before the instruction or situation in which damage could occur v Caution These statements indicate situations that can be potentially hazardous to you...

Страница 21: ...s and hold the Ctrl key while you select the books Click View Book to view the selected book or books in Acrobat Reader or xpdf If you selected more than one book all the selected books are opened in...

Страница 22: ...and serviceability features Three important features in server design are reliability availability and serviceability RAS These RAS features are designed to help you protect the integrity of the data...

Страница 23: ...gement Module Web interface After you have installed the BladeCenter QS20 the blade server can start in any of the following ways v You can press the power control button on the front of the blade ser...

Страница 24: ...press and hold the power control button for more than 4 seconds to turn off the blade server v You can use the BladeCenter Management Module Web interface to turn on the blade server remotely Note Aft...

Страница 25: ...rator to aid in visually locating the blade server The location LED on the BladeCenter unit will be lit also Activity LED When this green LED is lit it indicates that there is network activity Power o...

Страница 26: ...8 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 27: ...ure that the BladeCenter unit is correctly connected to a power source v Reseat the blade server in the BladeCenter unit v If the power on LED is flashing slowly turn on the blade server see Turning o...

Страница 28: ...d management and configuration program This is your main access method to the blade server or The command line interface See Using the command line interface on page 11 v The serial interface See Usin...

Страница 29: ...ust use the serial interface instead Starting the management and configuration program in the Management Module Use the Management Module Web based management and configuration program to v Configure...

Страница 30: ...o power domains What happens if the blade server is accidentally installed into blade bays 6 and 7 If you accidentally insert a BladeCenter QS20 into blade bay slots 6 and 7 this does not affect the B...

Страница 31: ...ule see the BladeCenter Type 8677 Hardware Maintenance Manual and Troubleshooting Guide for more information v If you have problems with an Ethernet switch module I O adapter or other optional device...

Страница 32: ...em reporting on page 28 Information LED Amber Not used supported Not applicable Activity LED Green There is network activity No action required Power on LED Flashing rapidly The service processor on t...

Страница 33: ...o blade bays 6 7 see Why you should not install the blade server into blade bays 6 and 7 on page 12 2 If you just installed an option in the blade server remove it and restart the blade server If the...

Страница 34: ...s on page 29 Software problems Symptom Suggested action You suspect a software problem 1 To determine whether the problem is caused by the software make sure that v the blade server has the minimum me...

Страница 35: ...t These images are referred to as TEMP and PERM respectively The system normally starts from the TEMP image and the PERM image serves as a backup If the TEMP image becomes damaged such as from a power...

Страница 36: ...d 2 The memory is initialized It takes several seconds to initialize the Rambus memory The screen displays details of the vendor and the speed of memory modules MEMORY Modules Samsung 256MB 3200 Mhz X...

Страница 37: ...Only yaboot is supported and must be installed on the Master Boot Record Use the Management Module set the boot list to Disk0 v Standard Bootp TFTP network boot Only the built in Gigabit Ethernet Cont...

Страница 38: ...Tasks Configuration Boot Sequence Message Boot list could not be read from VPD Reason The firmware can not access the VPD It is possible that a service processor communication failure occurred Action...

Страница 39: ...me subnet with no router in between and that the TFTP server is reachable from the Blade Message E3003 TFTP Could not load file filename Reason The blade failed to load a file via tftp The reason for...

Страница 40: ...a UDP packet based on its transfer ID It could be that another client is using the transfer ID for this connection Action Reboot and retry the transfer If the problem persists check the configuration...

Страница 41: ...irmware image incomplete Reason The firmware detected missing components and cannot continue execution Action The boot watchdog automatically boots the PERM firmware image The malfunctioning firmware...

Страница 42: ...quest RRAC training BD BE1 does not request RRAC training BE BE0 does not request bus credentials BF BE1 does not request bus credentials BG BE0 still needs attention after init procedure is is done B...

Страница 43: ...D memory chip DJ The VID that is set in the volterra master device does not match to the target VID DK No response from PS1 Volterra master device during VID read write DL No response from PS2 Volterr...

Страница 44: ...from VPD G5 The BE core voltages can not be read from VPD during device initialization because VPD is constantly busy G6 The revision ID of the ICS9214 clock multiplier chip is not supported GA Junct...

Страница 45: ...rveillance watchdog J2 1e2 successful stress cycles completed J3 1e3 successful stress cycles completed J4 1e4 successful stress cycles completed J5 1e5 successful stress cycles completed J6 1e6 succe...

Страница 46: ...Diagnostic Boot Restart BladeCenter QS20 with Diagnostic Boot and Default Bootlist Restart BladeCenter QS20 with NMI Problem reporting Firmware logs and Firmware settings are located in the system s N...

Страница 47: ...the blade servers has the problem troubleshoot the blade server that has the problem If the blade server is inoperative use the information in this section If you suspect that a software problem is ca...

Страница 48: ...as possible v Machine type and model v Microprocessor and hard disk drive upgrades v Failure symptoms Does the blade server fail the diagnostic programs If so what are the error codes What occurs Whe...

Страница 49: ...v Operating system control file setup Chapter 2 Diagnostics and troubleshooting 31...

Страница 50: ...32 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 51: ...g the BladeCenter Management Module Installing the firmware You only need to install the BladeCenter QS20 firmware if you need to do either of the following v Upgrade to a newer version v Downgrade to...

Страница 52: ...an old image on PERM you must copy the TEMP image to PERM side The command is echo 0 proc rtas manage_flash Note The script checks whether the board is booted from the TEMP image If not the script doe...

Страница 53: ...le hvc0 boot device Specifies the device for the yaboot loader Must contain a valid device node from the device tree or a valid device alias For example setenv boot device pci 24004000000 ata d disk N...

Страница 54: ...ards Mellanox InfiniBand MHEA28 1TCSB The firmware supports only this PCI Express card per socket There are two sockets available one on each I O bridge The card and its settings can be found in devic...

Страница 55: ...self or request IBM to install it at no additional charge under the type of warranty service that is designated for your server v Field replaceable unit FRU FRUs must be installed only by trained serv...

Страница 56: ...38 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 57: ...h now command If the blade server was not turned off press the power control button behind the blade server control panel door to turn off the blade server You do not have to shut down the BladeCente...

Страница 58: ...me v Do not touch solder joints pins or exposed printed circuitry v Do not leave the device where others can handle and damage it v While the device is still in its static protective package touch it...

Страница 59: ...The blade server is a hot swap device and the blade bays in the BladeCenter unit are hot swap bays Therefore you can install or remove the blade server without removing power from the BladeCenter uni...

Страница 60: ...4 Pull the blade server out of the bay 5 Place either a filler blade or a new blade server in the bay within 1 minute 42 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 61: ...ver from the blade server and set it aside see Figure 7 step 2 5 Remove the second power board see Figure 7 step 3 6 Disconnect any optionally installed PCI Express cables 7 Press the two front bezel...

Страница 62: ...Hazardous energy is present when the blade server is connected to the power source Always replace the blade cover before installing the blade server 44 BladeCenter QS20 Type 0200 Problem Determinatio...

Страница 63: ...l cable from the serial connector 6 Pull the bezel assembly away from the blade server 7 Store the bezel assembly in a safe place Installing the IDE hard disk drive The blade server has a connector on...

Страница 64: ...structions 5 Place the tray from the option kit on the system board aligning the tray with the screws on the system board Note the four screws that are under the four screw holes in the tray Set the t...

Страница 65: ...niBand installed otherwise the blade will hang during the initial reboot after the OS installation 3 If your BladeCenter QS20 comes with InfiniBand option s already installed unplug the PCI Express ca...

Страница 66: ...and card Installing InfiniBand To install an InfiniBand option do the following 1 Shut down the BladeCenter QS20 2 Remove the BladeCenter QS20 from BladeCenter 3 Open the top cover 4 Unlatch the front...

Страница 67: ...PCIe Express adapter card Make sure the index hole of the InfiniBand card matches the index mark of the adapter see Figure 11 on page 50 Figure 10 Unplugging the control panel and serial cable connect...

Страница 68: ...e front bezel and match the respective ports of the front bezel 9 Secure the assembly with the four screws that were delivered with your InfiniBand card see Figure 12 on page 51 Figure 11 InfiniBand c...

Страница 69: ...al guides while ensuring that the top of the bezel rests on the foam gasket on the InfiniBand card as shown in Figure 13 on page 52 Note Make sure the serial cable routed along the inside and across t...

Страница 70: ...d it is recommended that you install it in the upper slot 15 Plug the PCI Express cable into the BladeCenter QS20 s PCI Express connector closest to the InfiniBand card Leave the other end unconnected...

Страница 71: ...second card when you install the connector to the upper card 18 Optional repeat the above steps for the second InfiniBand option Note When you install the lower second InfiniBand option make sure that...

Страница 72: ...20 Carefully close the cover Figure 16 Cover with gasket 54 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 73: ...reset the system date and time through the operating system that you installed Statement 2 CAUTION When replacing the lithium battery use only IBM Part Number 33F8354 or 15F8409 or an equivalent type...

Страница 74: ...its socket The spring mechanism will push the battery out toward you as you slide it from the socket Note You might need to lift the battery clip slightly with your fingernail to make it easier to sl...

Страница 75: ...efore installing the blade server 11 Reinstall the blade server into the BladeCenter unit see BladeCenter QS20 Installation and User s Guide 12 Turn on the blade server see Turning on the blade server...

Страница 76: ...ce the battery or the system board assembly reset the system date and time through the operating system that you installed For additional information see your operating system documentation Note If yo...

Страница 77: ...ly 4 Carefully slide the bezel assembly onto the blade server as shown in the illustration until it clicks into place Note v If InfiniBand is installed partially insert the side fins of the bezel into...

Страница 78: ...58 for instructions and Figure 19 step 2 4 If you removed the second power board replace it now see Figure 19 step 2 5 If you disconnected any PCI Express cables reconnect them now See the documentati...

Страница 79: ...Take care not to exceed the cable s minimum bending radius Input output connectors and devices The BladeCenter unit contains the input output connectors that are available to the blade server See the...

Страница 80: ...62 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 81: ...our IBM product The documentation that comes with BladeCenter systems also describes the diagnostic tests that you can perform Most BladeCenter systems operating systems and programs come with documen...

Страница 82: ...for support telephone numbers In the U S and Canada call 1 800 IBM SERV 1 800 426 7378 Hardware service and support You can receive hardware service through IBM Services or through your IBM reseller...

Страница 83: ...rranties in certain transactions therefore this statement may not apply to you This information could include technical inaccuracies or typographical errors Changes are periodically made to the inform...

Страница 84: ...rposes of developing using marketing or distributing application programs conforming to the application programming interface for the operating platform for which the sample programs are written These...

Страница 85: ...U S Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp Appendix B Notices 67...

Страница 86: ...emarks or registered trademarks of Sun Microsystems Inc in the United States other countries or both Adaptec and HostRAID are trademarks of Adaptec Inc in the United States other countries or both Lin...

Страница 87: ...bility and fitness for a particular purpose These products are offered and warranted solely by third parties IBM makes no representations or warranties with respect to non IBM products Support if any...

Страница 88: ...er listed on the battery available prior to your call In California the following applies Perchlorate Material special handling may apply See http www dtsc ca gov hazardouswaste perchlorate The forego...

Страница 89: ...A digital apparatus complies with Canadian ICES 003 Avis de conformit la r glementation d Industrie Canada Cet appareil num rique de la classe A est conforme la norme NMB 003 du Canada Australia and N...

Страница 90: ...t tszeichen CE zu f hren Verantwortlich f r die Konformit tserkl rung nach Paragraf 5 des EMVG ist die IBM Deutschland GmbH 70548 Stuttgart Informationen in Hinsicht EMVG Paragraf 4 Abs 1 4 Das Ger t...

Страница 91: ...panese Voluntary Control Council for Interference VCCI statement The following statement applies to the BladeCenter QS20 and the 2945 InfiniBand Option Korean Class A warning statement The following s...

Страница 92: ...er Used in these countries and regions 02K0546 China 13F9940 Australia Fiji Kiribati Nauru New Zealand Papua New Guinea 13F9979 Afghanistan Albania Algeria Andorra Angola Armenia Austria Azerbaijan Be...

Страница 93: ...Barbados Belize Bermuda Bolivia Brazil Caicos Islands Canada Cayman Islands Costa Rica Colombia Cuba Dominican Republic Ecuador El Salvador Guam Guatemala Haiti Honduras Jamaica Japan Mexico Micrones...

Страница 94: ...76 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 95: ...ronics IDE hard disk drives 45 internal installing 45 requirements 45 specifications 3 E electronic emission Class A notice 70 environment 4 error messages boot errors 20 boot list 20 network boot 21...

Страница 96: ...EMP image 17 ports input output 61 power identifying problems 15 problem 15 power cords 74 power control button 6 problem how to report a 29 problem reporting 28 problems power 15 service processor 16...

Страница 97: ...reject function 17 starting 17 trademarks 68 troubleshooting charts 13 overview 9 turning off the blade server 5 turning on the blade server 5 U UART for serial console 35 UART for service processor c...

Страница 98: ...80 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...

Страница 99: ......

Страница 100: ...Part Number 42C4969 Printed in USA SC33 8297 00 1P P N 42C4969...

Отзывы: