background image

A

ttention:

   

v

   

Do

 

not

 

press

 

on

 

the

 

top

 

of

 

the

 

hard

 

disk

 

drive

 

when

 

installing

 

it.

 

Pressing

 

the

 

top

 

could

 

damage

 

the

 

hard

 

disk

 

drive.

 

v

   

ID

E

 

hard

 

disk

 

drives

 

must

 

be

 

set

 

to

 

master.

Complete

 

the

 

following

 

steps

 

to

 

install

 

a

 

2.

5

-inch

 

ID

E

 

hard

 

disk

 

drive:

 

 

1

.

   

Read

 

the

 

safety

 

information

 

beginning

 

on

 

page

 

v

 

and

 

Installation

 

guidelines

 

on

 

page

 

2

1

.

 

 

2.

   

If

 

the

 

blade

 

server

 

is

 

operating,

 

shut

 

down

 

the

 

Linux

 

operating

 

system

 

by

 

typing

 

the

 

shutdown

 

-h

 

now

 

command.

 

If

 

the

 

blade

 

server

 

was

 

not

 

turned

 

off,

 

press

 

the

 

power-control

 

button

 

(

behind

 

the

 

blade-server

 

control-panel

 

door

)

 

to

 

turn

 

off

 

the

 

blade

 

server.

 

See

 

Blade

 

server

 

controls

 

and

 

L

E

Ds

 

on

 

page

 

11

 

for

 

more

 

information

 

about

 

the

 

location

 

of

 

the

 

power-control

 

button.

 

 

3

.

   

Remove

 

the

 

blade

 

server

 

from

 

the

 

BladeCenter

 

unit.

 

(

See

 

Removing

 

the

 

blade

 

server

 

from

 

the

 

BladeCenter

 

unit

 

on

 

page

 

2

3

 

for

 

instructions.

)

 

Carefully

 

place

 

the

 

blade

 

server

 

on

 

a

 

flat,

 

static-protective

 

surface.

 

 

4.

   

O

pen

 

the

 

blade

 

server

 

cover.

 

See

 

“O

pening

 

the

 

blade

 

server

 

cover

 

on

 

page

 

2

5

 

for

 

instructions.

 

 

5

.

   

Place

 

the

 

tray

 

from

 

the

 

option

 

kit

 

on

 

the

 

system

 

board,

 

aligning

 

the

 

tray

 

with

 

the

 

screws

 

on

 

the

 

system

 

board.

 

Note

 

the

 

four

 

screws

 

that

 

are

 

under

 

the

 

four

 

screw

 

holes

 

in

 

the

 

tray.

 

Set

 

the

 

tray

 

aside

 

and

 

remove

 

the

 

four

 

screws.

 

 

6.

   

Replace

 

the

 

tray

 

and

 

secure

 

the

 

tray

 

to

 

the

 

system

 

board

 

with

 

screws

 

from

 

the

 

hardware

 

kit.

 

 

7.

   

Connect

 

the

 

cable

 

to

 

the

 

PCI

 

ATA

 

controller

 

at

 

one

 

end

 

and

 

the

 

hard

 

disk

 

drive

 

at

 

the

 

other

 

end.

 

 

8

.

   

Insert

 

the

 

PCI

 

ATA

 

controller

 

card

 

into

 

the

 

slot

 

on

 

the

 

system

 

board

 

 

9

.

   

Place

 

the

 

hard

 

disk

 

drive

 

into

 

the

 

tray

 

and,

 

from

 

the

 

rear

 

edge

 

of

 

the

 

hard

 

disk

 

drive,

 

push

 

it

 

into

 

the

 

tray.

 

The

 

hard

 

disk

 

drive

 

clicks

 

into

 

place.

 

1

0.

   

If

 

you

 

have

 

other

 

options

 

to

 

install

 

or

 

remove,

 

do

 

so

 

now

;

 

otherwise,

 

go

 

to

 

Completing

 

the

 

installation

 

on

 

page

 

40.

 

PCI ATA controller

Hard disk

Cable connected to
PCI ATA controller

Cable connected to
hard disk

IDE Drive

Tray

PCI ATA Controller

1. Install the hard disk into the blade server

2. Hard disk and PCI ATA controller installed on the

blade server system board

Cable connected to
PCI ATA Controller

Cable connected to
hard disk

  

Figure

 

11.

 

Installing

 

the

 

hard

 

disk

 

28

 

BladeCenter

 

QS20

 

Type

 

0200:

 

Installation

 

and

 

User

s

 

Guide

Содержание BladeCenter QS20

Страница 1: ...ur blade server on the IBM Support Web site Before installing the BladeCenter QS20 in a BladeCenter unit complete the following procedures Install and configure the rack according to the documentation...

Страница 2: ...blem View support telephone numbers at http www ibm com planetwide View information about IBM Support Line at or view support telephone numbers at http www ibm com services sl products http www ibm co...

Страница 3: ...BladeCenter QS20 Type 0200 Installation and User s Guide SC33 8284 02...

Страница 4: ...al information in Appendix B Notices on page 61 Third Edition September 2006 Copyright International Business Machines Corporation 2005 All rights reserved US Government Users Restricted Rights Use du...

Страница 5: ...ng replaceable units 21 Installation guidelines 21 System reliability guidelines 21 Handling static sensitive devices 22 Removing the blade server from the BladeCenter unit 23 Opening the blade server...

Страница 6: ...tion notice 62 Trademarks 64 Important notes 65 Product recycling and disposal 65 Battery return program 66 Electronic emission notices 66 Federal Communications Commission FCC statement 66 Industry C...

Страница 7: ...alleert eerst de veiligheidsvoorschriften Ennen kuin asennat t m n tuotteen lue turvaohjeet kohdasta Safety Information Avant d installer ce produit lisez les consignes de s curit Vor der Installation...

Страница 8: ...s of the caution or danger statement in the IBM Safety Information book For example if a caution statement begins with a number 1 translations for that caution statement appear in the IBM Safety Infor...

Страница 9: ...quipment when there is evidence of fire water or structural damage v Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instruc...

Страница 10: ...um battery replace it only with the same module type made by the same manufacturer The battery contains lithium and can explode if not properly used handled or disposed of Do not v Throw or immerse in...

Страница 11: ...he device v Use of controls or adjustments or performance of procedures other than those specified herein might result in hazardous radiation exposure DANGER Some laser products contain an embedded Cl...

Страница 12: ...he device and the power switch on the power supply do not turn off the electrical current supplied to the device The device also might have more than one power cord To remove all electrical current fr...

Страница 13: ...act a service technician Statement 13 DANGER Overloading a branch circuit is potentially a fire hazard and a shock hazard under certain conditions To avoid these hazards ensure that your system electr...

Страница 14: ...fter handling ADVERTENCIA El contacto con el cable de este producto o con cables de accesorios que se venden junto con este producto pueden exponerle al plomo un elemento qu mico que en el estado de C...

Страница 15: ...s There is a highspeed RAMBUS interface to the processor a 4x PCI Express channel a 32bit 33MHZ PCI bus interface which is specified to attach the PATA controller to the board 1 Gigabit Ethernet MAC a...

Страница 16: ...blades into the IBM BladeCenter unit You can install up to seven hot swap BladeCenter QS20 blades in each BladeCenter unit Because a BladeCenter chassis is seven U high six BladeCenter unit completely...

Страница 17: ...imum number of power modules required Install power module in the following power module bays Blade bays 1 6 One 1 for redundancy you can install a second power module in power module bay 2 Blade bays...

Страница 18: ...umber that you can use to locate the corresponding statement in your language in the Safety Information document v Warranty and Support Information This document is in PDF on the IBM Documentation CD...

Страница 19: ...requires the following minimum hardware and software v Microsoft Windows NT 4 0 with Service Pack 3 or later Windows 98 Windows 2000 Windows XP AIX UNIX SUSE LINUX or Red Hat Linux v 100 MHz micropro...

Страница 20: ...the CD into your CD ROM drive then run the following command from the mnt cdrom directory sh runlinux sh The Available Topics list displays all the books for the blade server Some books might be in f...

Страница 21: ...n of a potentially hazardous procedure step or situation v Danger These statements indicate situations that can be potentially lethal or extremely hazardous to you A danger statement is placed just be...

Страница 22: ...pply 12 V DC Reliability availability and serviceability features Three important features in server design are reliability availability and serviceability RAS These RAS features are designed to help...

Страница 23: ...n the front of the server is lit See Blade server controls and LEDs on page 11 for the power on LED states v Throughout this document the Management Module Web based user interface is also known as th...

Страница 24: ...s v You can press the power control button on the blade server behind the control panel door This starts an orderly shutdown of the operating system if this feature is supported by your operating syst...

Страница 25: ...l door Press this button to manually turn the blade server on or off Note The power control button has effect only if local power control is enabled for the blade server Local power control is enabled...

Страница 26: ...lso Activity LED When this green LED is lit it indicates that there is network activity Power on LED This green LED indicates the power status of the blade server in the following manner v Flashing ra...

Страница 27: ...rocessor 1 and heat sink U31 Control panel connector J9 PCI expansion slot Microprocessor 0 and heat sink U1 PCI Express J14 J15 Figure 5 System board components Chapter 2 Blade server power controls...

Страница 28: ...14 BladeCenter QS20 Type 0200 Installation and User s Guide...

Страница 29: ...one or two Gigabit Ethernet modules in the BladeCenter unit For the BladeCenter QS20 only the following BladeCenter Ethernet switch modules are supported v Nortel Networks Layer 2 3 Copper Gigabit Eth...

Страница 30: ...IBM BladeCenter Nortel Networks Layer 2 3 GbE Switch Module Installation Guide Note For more information see Related documentation on page 4 16 BladeCenter QS20 Type 0200 Installation and User s Guide...

Страница 31: ...ries by the wattage of the power supplies that are installed in the BladeCenter unit For more information about determining the power requirements for the blade server see the IBM BladeCenter Power Mo...

Страница 32: ...page 21 2 If you have not done so already install any options needed such as disk drives or memory in the blade server 3 Select the bay for the blade server 4 If the bay that you selected contains fi...

Страница 33: ...a continuously lit steady state b Install the operating system Use the installation instructions that come with the operating system For more information see Chapter 7 Installing the operating system...

Страница 34: ...20 BladeCenter QS20 Type 0200 Installation and User s Guide...

Страница 35: ...e server was not turned off press the power control button behind the blade server control panel door to turn off the blade server You do not have to shut down the BladeCenter unit itself v Blue on a...

Страница 36: ...s frame v Do not touch solder joints pins or exposed printed circuitry v Do not leave the device where others can handle and damage it v While the device is still in its static protective package touc...

Страница 37: ...The blade server is a hot swap device and the blade bays in the BladeCenter unit are hot swap bays Therefore you can install or remove the blade server without removing power from the BladeCenter uni...

Страница 38: ...4 Pull the blade server out of the bay 5 Place either a filler blade or a new blade server in the bay within 1 minute 24 BladeCenter QS20 Type 0200 Installation and User s Guide...

Страница 39: ...er from the blade server and set it aside see Figure 9 step 2 5 Remove the second power board see Figure 9 step 3 6 Disconnect any optionally installed PCI Express cables 7 Press the two front bezel r...

Страница 40: ...UTION Hazardous energy is present when the blade server is connected to the power source Always replace the blade cover before installing the blade server 26 BladeCenter QS20 Type 0200 Installation an...

Страница 41: ...cable from the serial connector 6 Pull the bezel assembly away from the blade server 7 Store the bezel assembly in a safe place Installing the IDE hard disk drive The blade server has a connector on t...

Страница 42: ...r instructions 5 Place the tray from the option kit on the system board aligning the tray with the screws on the system board Note the four screws that are under the four screw holes in the tray Set t...

Страница 43: ...iniBand installed otherwise the blade will hang during the initial reboot after the OS installation 3 If your BladeCenter QS20 comes with InfiniBand option s already installed unplug the PCI Express c...

Страница 44: ...iniBand card Installing InfiniBand To install an InfiniBand option do the following 1 Shut down the BladeCenter QS20 2 Remove the BladeCenter QS20 from BladeCenter 3 Open the top cover 4 Unlatch the f...

Страница 45: ...PCIe Express adapter card Make sure the index hole of the InfiniBand card matches the index mark of the adapter see Figure 13 on page 32 Figure 12 Unplugging the control panel and serial cable connect...

Страница 46: ...to the front bezel and match the respective ports of the front bezel 9 Secure the assembly with the four screws that were delivered with your InfiniBand card see Figure 14 on page 33 Figure 13 InfiniB...

Страница 47: ...al guides while ensuring that the top of the bezel rests on the foam gasket on the InfiniBand card as shown in Figure 15 on page 34 Note Make sure the serial cable routed along the inside and across t...

Страница 48: ...talled it is recommended that you install it in the upper slot 15 Plug the PCI Express cable into the BladeCenter QS20 s PCI Express connector closest to the InfiniBand card Leave the other end unconn...

Страница 49: ...second card when you install the connector to the upper card 18 Optional repeat the above steps for the second InfiniBand option Note When you install the lower second InfiniBand option make sure that...

Страница 50: ...20 Carefully close the cover Figure 18 Cover with gasket 36 BladeCenter QS20 Type 0200 Installation and User s Guide...

Страница 51: ...t reset the system date and time through the operating system that you installed Statement 2 CAUTION When replacing the lithium battery use only IBM Part Number 33F8354 or 15F8409 or an equivalent typ...

Страница 52: ...t from its socket The spring mechanism will push the battery out toward you as you slide it from the socket Note You might need to lift the battery clip slightly with your fingernail to make it easier...

Страница 53: ...replace the blade cover before installing the blade server 11 Reinstall the blade server into the BladeCenter unit 12 Turn on the blade server see Turning on the blade server on page 9 13 Reset the sy...

Страница 54: ...e system board assembly reset the system date and time through the operating system that you installed For additional information see your operating system documentation Note If you have just connecte...

Страница 55: ...y 4 Carefully slide the bezel assembly onto the blade server as shown in the illustration until it clicks into place Note v If InfiniBand is installed partially insert the side fins of the bezel into...

Страница 56: ...age 40 for instructions and Figure 21 step 2 4 If you removed the second power board replace it now see Figure 21 step 2 5 If you disconnected any PCI Express cables reconnect them now See the documen...

Страница 57: ...y no longer block the cover Take care not to exceed the cable s minimum bending radius Input output connectors and devices The BladeCenter unit contains the input output connectors that are available...

Страница 58: ...44 BladeCenter QS20 Type 0200 Installation and User s Guide...

Страница 59: ...system For information about setting up your network configuration for remote management see the IBM BladeCenter Planning and Installation Guide or the IBM BladeCenter T Installation and User s Guide...

Страница 60: ...ole command prompts You must use the serial interface instead Using the serial interface Use the serial interface to v Observe firmware progress v Access the Linux terminal in order to configure Linux...

Страница 61: ...ubsequent logins All login attempts are documented in the event log The initial user ID and password for the Management Module are v User ID USERID all capital letters v Password PASSW0RD note the num...

Страница 62: ...controller port to a particular BladeCenter unit I O bay depends on the type of Ethernet expansion card that is installed You can verify which Ethernet controller port in this blade server is routed t...

Страница 63: ...Type 8677 Planning and Installation Guide 2 From the Blade Tasks section select Firmware VPD The Blade Server Firmware VPD window contains the build identifier release and revision Compare this inform...

Страница 64: ...tall the firmware do the following 1 Ensure the rtas flash driver is loaded To do this run lsmod 2 If the module is not yet in the kernel invoke the following to load it modprobe rtas_flash 3 To updat...

Страница 65: ...r additional information see the instructions that come with your operating system documentation and the service packs or update packages To install the operating system on a blade server follow the i...

Страница 66: ...52 BladeCenter QS20 Type 0200 Installation and User s Guide...

Страница 67: ...compatible with the blade server and its components If the device or component is not compatible remove it from the blade server reinstall the blade server in the BladeCenter unit and then restart the...

Страница 68: ...eCenter unit see the applicable Hardware Maintenance Manual and Troubleshooting Guide or other documentation that comes with the device for more information Problems indicated by LEDs Table 5 Explanat...

Страница 69: ...equired Flashing slowly The blade server has power but is not turned on Turn on if required Lit continuously steady The blade server has power and is turned on No action required Not lit Blade server...

Страница 70: ...2 If you just installed an option in the blade server remove it and restart the blade server If the blade server now turns on troubleshoot the option see the documentation that comes with the option...

Страница 71: ...e blade server was not turned off press the power control button behind the blade server control panel door to turn off the server 3 Remove the blade server from the BladeCenter unit 4 Wait 30 seconds...

Страница 72: ...image complete the following steps 1 Turn off the blade server 2 Restart the blade system management processor from the Management Module 3 Turn on the blade server Note If the blade server does not r...

Страница 73: ...our IBM product The documentation that comes with BladeCenter systems also describes the diagnostic tests that you can perform Most BladeCenter systems operating systems and programs come with documen...

Страница 74: ...twide for support telephone numbers In the U S and Canada call 1 800 IBM SERV 1 800 426 7378 Hardware service and support You can receive hardware service through IBM Services or through your IBM rese...

Страница 75: ...rranties in certain transactions therefore this statement may not apply to you This information could include technical inaccuracies or typographical errors Changes are periodically made to the inform...

Страница 76: ...he purposes of developing using marketing or distributing application programs conforming to the application programming interface for the operating platform for which the sample programs are written...

Страница 77: ...U S Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp Appendix B Notices 63...

Страница 78: ...trademarks or registered trademarks of Sun Microsystems Inc in the United States other countries or both Adaptec and HostRAID are trademarks of Adaptec Inc in the United States other countries or bot...

Страница 79: ...bility and fitness for a particular purpose These products are offered and warranted solely by third parties IBM makes no representations or warranties with respect to non IBM products Support if any...

Страница 80: ...number listed on the battery available prior to your call In California the following applies Perchlorate Material special handling may apply See http www dtsc ca gov hazardouswaste perchlorate The f...

Страница 81: ...A digital apparatus complies with Canadian ICES 003 Avis de conformit la r glementation d Industrie Canada Cet appareil num rique de la classe A est conforme la norme NMB 003 du Canada Australia and N...

Страница 82: ...formit tszeichen CE zu f hren Verantwortlich f r die Konformit tserkl rung nach Paragraf 5 des EMVG ist die IBM Deutschland GmbH 70548 Stuttgart Informationen in Hinsicht EMVG Paragraf 4 Abs 1 4 Das G...

Страница 83: ...panese Voluntary Control Council for Interference VCCI statement The following statement applies to the BladeCenter QS20 and the 2945 InfiniBand Option Korean Class A warning statement The following s...

Страница 84: ...number Used in these countries and regions 02K0546 China 13F9940 Australia Fiji Kiribati Nauru New Zealand Papua New Guinea 13F9979 Afghanistan Albania Algeria Andorra Angola Armenia Austria Azerbaij...

Страница 85: ...Barbados Belize Bermuda Bolivia Brazil Caicos Islands Canada Cayman Islands Costa Rica Colombia Cuba Dominican Republic Ecuador El Salvador Guam Guatemala Haiti Honduras Jamaica Japan Mexico Micrones...

Страница 86: ...72 BladeCenter QS20 Type 0200 Installation and User s Guide...

Страница 87: ...r enumeration 48 Ethernet 47 IDE 8 cover closing 42 removing 25 D danger statements 7 device driver Ethernet controller 48 documentation CD 5 drive connectors 12 integrated drive electronics IDE hard...

Страница 88: ...irements 51 installing 51 operating system continued Linux ppc64 utilities 51 network connection requirements 51 service packs 51 update packages 51 option hard disk drives 27 installing 21 P PERM ima...

Страница 89: ...ct function 58 starting 58 trademarks 64 troubleshooting charts 54 overview 53 turning off the blade server 10 turning on the blade server 9 U United States electronic emission Class A notice 66 Unite...

Страница 90: ...76 BladeCenter QS20 Type 0200 Installation and User s Guide...

Страница 91: ......

Страница 92: ...Part Number 43W7874 Printed in USA SC33 8284 02 1P P N 43W7874...

Отзывы: