214
Planning, Installing, and Managing the IBM System x3950 M2
Figure 4-14 x3950 M2: ScaleXpander cable routing
4. Ensure each server can be pulled out fully at the front of the rack and the
scalability cables are clearly routed.
4.6.2 Three-node configuration
A three-node configuration requires three 3.0 m (9.8-foot) ScaleXpander cables.
The cable diagram is shown in Figure 4-15 on page 215. One 3.0 m cable is
included with every x3950 M2 system, or with the ScaleXpander Option Kit (for
upgraded x3850 M2 systems).
The scalability cables required for a three-node configuration are listed in
Table 4-5.
Table 4-5 Scalability cables for three-node configuration
Route the cables through
hanger brackets, balancing
the slack in the cables
between the CMAs and the
nodes and in the side of the
rack.
Scalability cable
Connection
3.0 m cable
Node 1: scalability port 1
→
node 2: scalability port 1
3.0 m cable
Node 1: scalability port 2
→
node 3: scalability port 1
3.0 m cable
Node 2: scalability port 2
→
node 3: scalability port 2
Содержание 88743BU - System x3950 E
Страница 2: ......
Страница 10: ...viii Planning Installing and Managing the IBM System x3950 M2 ...
Страница 14: ...xii Planning Installing and Managing the IBM System x3950 M2 ...
Страница 106: ...88 Planning Installing and Managing the IBM System x3950 M2 ...
Страница 262: ...244 Planning Installing and Managing the IBM System x3950 M2 Figure 4 36 IBM System x technical support on the Web ...
Страница 309: ...Chapter 5 Installation 291 Figure 5 36 Select type of installation Upgrade or Custom clean installation ...
Страница 316: ...298 Planning Installing and Managing the IBM System x3950 M2 ...
Страница 398: ...380 Planning Installing and Managing the IBM System x3950 M2 ...
Страница 423: ... 0 5 spine 0 475 0 875 250 459 pages Planning Installing and Managing the IBM System x3950 M2 ...
Страница 424: ......
Страница 425: ......