Step 5. Attach the Mounting Hardware to the Rack Enclosure
1. Install the cage nuts for the rack rails and the cable management arm on the
mounting rails of the rack enclosure.
Note: You must align the rack rails correctly. Otherwise, the installation cannot be
completed successfully.
a. Position the template on the front mounting rail, aligning the holes.
b. Install the cage nuts, using the locations shown on the template.
c. Move the template to the rear mounting rails.
d. Install the cage nuts, using the locations shown on the template.
Front View
Rear View
Rack
Mounting
Template
Rack
Mounting
Template
Chapter 1. Setting Up the System
5
Содержание 6C1
Страница 1: ...pSeries 610 Model 6C1 and Model 6E1 Installation Guide SA38 0597 02 ERserver IBM ...
Страница 2: ......
Страница 3: ...pSeries 610 Model 6C1 and Model 6E1 Installation Guide SA38 0597 02 ERserver IBM ...
Страница 8: ...Checking the Current Firmware Levels 119 Updating System Firmware 119 Index 121 vi Installation Guide ...
Страница 12: ...x Installation Guide ...
Страница 14: ...xii Installation Guide ...
Страница 25: ...d Attach the rails to the sides of the server with M4 by 5 mm screws Chapter 1 Setting Up the System 9 ...
Страница 44: ...28 Installation Guide ...
Страница 48: ...32 Installation Guide ...
Страница 98: ...82 Installation Guide ...
Страница 124: ...108 Installation Guide ...
Страница 130: ...114 Installation Guide ...
Страница 140: ...124 Installation Guide ...
Страница 143: ......