2.
Proceed to “Powering on the system.”
Powering on the system
After you complete the physical installation of the system, you can power on the
system.
1.
Ensure that all power supplies are fully and properly inserted and no power
supply slots are uncovered.
Attention:
Never leave tools inside the device.
2.
Remove the power cord from the shipping package.
3.
Attach the AC power cable to the AC connector on the rear panel.
4.
Insert the power cable plug into a 115V/120V outlet.
Note:
To turn the system off, simply unplug the power cord(s).
Note:
The socket should be installed near the equipment and should be easily
accessible.
Note:
If the outlet is not rated 115/120V, stop and get the appropriate cable for
the outlet.
net48bc021
Figure 15. Installing the switch in a rack
Chapter 3. Installation
21
Содержание 4002-C2A
Страница 2: ......
Страница 10: ...viii IBM Ethernet Switch c series Installation and User Guide...
Страница 12: ...x IBM Ethernet Switch c series Installation and User Guide...
Страница 26: ...xxiv IBM Ethernet Switch c series Installation and User Guide...
Страница 28: ...2 IBM Ethernet Switch c series Installation and User Guide...
Страница 43: ...net48bc017 Figure 11 Front rack mount position Chapter 3 Installation 17...
Страница 45: ...net48bc019 Figure 13 Mid rack mount position Chapter 3 Installation 19...
Страница 64: ...38 IBM Ethernet Switch c series Installation and User Guide...
Страница 86: ...60 IBM Ethernet Switch c series Installation and User Guide...
Страница 97: ......
Страница 98: ...Part Number 45W5355 Printed in USA GC27 2238 01 1P P N 45W5355 53 1001492 01...