© Copyright IBM Corporation 2020, 2021 Customer Install Guide, 100G Switch
7
•
Connect and disconnect cables as described in the following procedures when
installing, moving, or opening covers on this product or attached devices.
To Disconnect:
1.
Turn off everything (unless instructed otherwise).
2.
For AC power, remove the power cords from the outlets.
3.
For racks with a DC power distribution panel (PDP), turn off the circuit
breakers located in the PDP and remove the power from the Customer's
DC power source.
4.
Remove the signal cables from the connectors.
5.
Remove all cables from the devices.
To connect:
6.
Turn off everything (unless instructed otherwise).
7.
Attach all cables to the devices.
8.
Attach the signal cables to the connectors.
9.
For AC power, attach the power cords to the outlets.
10.
For racks with a DC power distribution panel (PDP), restore the power
from the Customer's DC power source and turn on the circuit breakers
located in the PDP.
11.
Turn on the devices.
Sharp edges, corners and joints may be present in and around the system. Use care when
handling equipment to avoid cuts, scrapes and pinching. (D005)
C002
CAUTION:
Only trained service personnel may replace this battery. The battery contains
lithium. To avoid possible explosion, do not burn or charge the battery.
Do not:
•
Throw or immerse into water
•
Heat to more than 100°C (212°F)
•
Repair or disassemble
Exchange only with the approved part. Recycle or discard the battery as instructed by local
regulations. (C002)