© Copyright IBM Corporation 2020, 2021 Customer Install Guide, 100G Switch
26
ALL OPEN RACK BAYS REQUIRE FILLERS TO PREVENT HOT AIR FROM
RECIRCULATING TO THE FRONT OF THE RACK AND INTO THE COLD
AIR INLETS.
DO NOT BLOCK ANY INLET OR EXHAUST DUCTS, VENTS OR PORTS
KEEP ALL POWER CORDS, SIGNAL CABLES AND TRANSCEIVERS WITH
THE INSTALLED CHASSIS FOR USE BY IBM INSTALLERS.
DO NOT POWER-ON THIS CHASSIS. POWER ON WILL BE DONE BY YOUR
IBM INSTALLATION TEAM.