36
Once a program as been created and saved it is ready to run. From the Program Select screen, touch
and highlight the program to be run. Touch the Run button. The display will change to the Run
Program screen and the program will commence.
NOTE!
If the lift platform has not been fully lowered prior to touching the “Run” button, the error
message “
Wait until Door opens then press RUN
” will be displayed and an alarm will sound. The lift
platform will then start to lower automatically. Touch the
OK
button to silence the alarm and clear the
error screen. Once the lift platform is completely lowered the
Run
button can be touched to start the
program.
Display Example #35
Display Example #35 shows the Program Run Screen. It provides critical information regarding the
running status of the program. Starting at the top, upper left corner, there is the name of the program
being run followed by the current temperature and vacuum level. The upper right corner shows the
date and time.
In the middle section of the screen, the far left column shows the program’s key parameters: Heat Rate,
Target Temp., Target Vac. and the current step of the program being run. The next column shows the
programmed values. The Heat Rate is 60°C /min, the target temperature of the current step is 890°C
and the target vacuum level is 73 cmHG. The current step is “High Temp Ramp”, meaning the
program is ramping up to the programmed high temp of 890°C. The right column shows two time
counters. The upper counter named “Completion Time” refers to overall time to program completion.
The counter shows that there is 6 minutes and 52 seconds until the program is completed. The lower
counter named “Step Time” refers to the time required to complete the current step. The counter shows
that there is 2 minutes and 22 seconds of the “High Temp Ramp” to reach a high temp of 890°C. Once
this timer has counted down to 0 minutes and 00 seconds, the temperature of 890°C will have been
reached. The next step, “Hold Time” will commence, the “Current Step will change to “Hold Time”
and the “Step Time” counter will show 1:30 and start counting down to zero.
Run a Program
Completion Time
6:52
Heat Rate
Target Temp.
Target Vac.
Current Step
60
890
7
73
High Temp Ramp
Edit
Stop
Skip Step
Utilities
Sample 1
748
C
72
cmHg
08/13/12
04:15:45
Step Time
2:22