For PPs material, use the 6" transition / adaptor fitting (Sch 40 to PPs) offered by the respective
PPs manufacturers Centrotherm / InnoflueTM (their part # ISAAL0606) or M&G Dura Vent /
PolyProTM (# 6PPS-06PVCM-6PPF [10004281]), (# 4PPs-AD). For PPs material exposed to
outdoor weather, follow the venting supplier’s recommendations on UV protection.
For SS material, use the 6" transition / adaptor fitting offered by the SS manufacturers M&G
Dura Vent (# FSA-6PVCM-6FNSF [300538]) or Heat Fab (Saf-T-Vent) 9601PVC.
Warning
Ensure that you lubricate the gasket with silicone grease before inserting the venting
material. Fully insert the approved venting material into the boiler's exhaust outlet,
and tighten clamp to ensure the venting connection is locked in place (as shown
below).
Figure 11
Securing the vent connection
Venting must be supported in accordance with the applicable code and instructions supplied by
the manufacturers.
Warning
Do not mix PPs venting materials from different manufacturers. These venting
materials are designed to be installed as part of a complete system. Failure to comply
may result in severe personal injury or death.
3.5.4 Vent travel
PVC/CPVC (Schedule 40), PPs (Rigid Single Wall), or SS approved piping are the standard
venting options that can be sited up to 120 equivalent feet from the vent termination.
22
Section: Installation
Содержание EX Series
Страница 62: ...Intentionally left empty...
Страница 80: ...Intentionally left empty...
Страница 121: ...Appendices Wiring diagrams Figure 73 Controller electrical diagram 119 Appendices...
Страница 122: ...Figure 74 Internal wiring diagram EX 400 and EX 500 models 120 Section Appendices...
Страница 123: ...Figure 75 Internal wiring diagram EX 700 and EX 850 models 121 Wiring diagrams...
Страница 124: ...Figure 76 Sequence of Operation 122 Section Appendices...
Страница 126: ...Intentionally left empty...
Страница 128: ...126 Boiler parts diagram EX 400 and EX 500...
Страница 132: ...130 Boiler parts diagram EX 700 and EX 850...