
3.4 Installation clearances
Warning
Exposed water piping and associated components (relief valves, circulators, etc.,
should not be in contact with combustible materials. Check local codes for required
clearances and / or provide adequate insulation.
EX 400, EX 500, EX 700, EX 850
Surface
Minimum distance from
combustible surfaces
Recommended clearance for
installation and service
Front
2"
30"
Rear flue connection
2"
24"
Left side
1"
2"
Right side
1"
4"
Top
6"
12"
(required for filter replacement)
Bottom
0
0
Table 3
Clearance distances for boiler mounting sites
3.5 Exhaust venting and air intake venting
Warning
Venting, condensate drainage, and combustion air systems for all IBC boilers must be
installed in compliance with all applicable codes and with instructions provided in the
respective installation manuals.
Inspect finished vent and air piping thoroughly to ensure all are airtight, and comply with
the instructions provided as well as with the requirements of applicable codes. Failure to
comply will result in severe personal injury or death.
When planning a boiler's installation, consider the appropriate vent materials, travel and
termination.
18
Section: Installation
Содержание EX Series
Страница 62: ...Intentionally left empty...
Страница 80: ...Intentionally left empty...
Страница 121: ...Appendices Wiring diagrams Figure 73 Controller electrical diagram 119 Appendices...
Страница 122: ...Figure 74 Internal wiring diagram EX 400 and EX 500 models 120 Section Appendices...
Страница 123: ...Figure 75 Internal wiring diagram EX 700 and EX 850 models 121 Wiring diagrams...
Страница 124: ...Figure 76 Sequence of Operation 122 Section Appendices...
Страница 126: ...Intentionally left empty...
Страница 128: ...126 Boiler parts diagram EX 400 and EX 500...
Страница 132: ...130 Boiler parts diagram EX 700 and EX 850...