16
3.4 Installation
Design the control box size, installing position of the gateway unit and cooling method of the control box in
such a way that the temperature around the gateway unit will not exceed 40°C.
Install the gateway unit vertically on a wall, as shown below, and provide a minimum clearance of 50mm
above and below the gateway unit and a minimum clearance of 100mm on the front for wiring.
For lateral installation such as installing multiple gateway units side by side, secure a sufficient space so that
the gateway unit is easily installed and removed.
If affection of heat or noise is a concern, take the measure into account.
Содержание RCM-GW-CC
Страница 1: ...IAI America Inc CC Link RCM GW CC Gateway Unit Operation ManualFirst Edition...
Страница 4: ......
Страница 10: ...6 1 5 How to identify model RCM GW CC Basic model For CC Link Gateway unit...
Страница 12: ...8 2 2 External dimension drawing Mounting dimension...
Страница 78: ...74...
Страница 82: ...78 Position data measurement value Present position 1 2 3 4 4 5 6 7...
Страница 84: ...80 Speed acceleration and deceleration set value Actuator speed Speed n2 Speed n3 1 2 3...
Страница 88: ...84 Command position No Completion position No 1 2 3 4 5 6...
Страница 91: ...87...
Страница 93: ...89...
Страница 115: ...111 Command P No 1 to axes 0 1 Set CSTR to 1 Set CSTR to 0 Positioning completed One second timer 2 1...
Страница 125: ...121 No 3 Axis 1 pause No 3 Axis 1 pause lamp No 3 Axis 1 STP...
Страница 130: ...126...
Страница 131: ......