background image

SMS S8 SMART MOBILE STATION

ASSEMBLY INSTRUCTIONS

Page #

    2

Cautionary & Attention Notes

    3

Exploded SMS S8 Assembly Drawing

  4-5

SMS S8 Smart Mobile Cart Parts List

    6

Installation of Upright and Electrical Power Connect

    7

Installation of Worksurface and Lower Shelf

  8-9

Installation of Keyboard Drawer and SMS Drawer

   10

Cord Wrap Bracket and Cable Management Channel

 11-12

Installation of FPD Front Mounting UPR MTD

   13

Installation of CPU Holder

   14

ESD Information and Grounding

Cautionary Notes and Warnings:

IAC strongly recommends care must be taken during the lifting and positioning of all workstation components

as they can be heavy and awkward to lift, move and install. Only qualified installation personnel using the
proper Personal Protective Equipment should be allowed to lift any of these components into place. Failure
to use proper lifting techniques and proper Personal Protective Equipment could result in injury individuals,
the workstation and/or surrounding property. IAC Industries is not responsible for any injuries sustained or
damage to the workstation and its contents and/or damage to surrounding property caused during the proper
or improper installation of the workstation.

ATTENTION

:

IAC Industries takes great care in the packing of it's products, however damage can occur during

shipment. Check all packages and parts for any signs of damage. If damage is evident STOP and
contact the carrier that delivered your order. Request a freight claim inspector to document the damage
and begin the freight claim process.

Tools required:

Utility knife, Safety glasses, and light duty protective gloves

NOTE: Power tools are NOT recommended unless they are equipped with a torque limiting device which can limit the

torque to 10 foot lbs maximum at aluminum attachment points, and 15 foot lbs for all other attachment points.

Unpack your order and separate like parts into separate areas.  Be careful not to damage parts as they

are being moved around and put into position. Also be sure all parts are removed from the packing
materials before these materials are thrown away.

Locate the hardware kits and keep them in a central area.  If the assembly is going to take more than

one day, all individual hardware pieces should be returned to a central location.

Check all parts and hardware kits against the itemized packing list found with the assembly instructions.

If you believe there are parts missing from your order please contact IAC Industries customer service
HOTLINE at 800-989-1422.

If your order has ESD worksurfaces or accessories please review pages 85 and 86 for cautions and

helpful suggestions before you begin assembling the workstations.

2

Содержание SMS S1 SMART MOBILE STATION

Страница 1: ...IAC INDUSTRIES 895 BEACON STREET BREA CA 92821 2926 Phone 713 990 8997 Fax 714 990 0557 www iacindustries com ASSEMBLY INSTRUCTIONS REVISON 112012 SMS S1 SMART MOBILE STATION UE ...

Страница 2: ...t Check all packages and parts for any signs of damage If damage is evident STOP and contact the carrier that delivered your order Request a freight claim inspector to document the damage and begin the freight claim process Tools required Utility knife Safety glasses and light duty protective gloves NOTE Power tools are NOT recommended unless they are equipped with a torque limiting device which c...

Страница 3: ...3 ...

Страница 4: ...ription Qty A 920452 Caster 4 TLCHR 1 2 13 Stem 4 B 900062 Nut 1 2 13 Zinc 4 C 900044 Bolt 5 16 18 x 750 Hex Head 4 D 900080 Washer 5 16 Flat Black 11 E 965241 SS Upright Top Cap 1 F 900230 Screw 1 4 20 x 625 Phillips Black 14 G 900068 Washer 1 4 Flat Black 14 H 900041 Bolt 5 16 18 x 750 SQHD Black 7 J 900115 Nut 5 16 18 Hex Keps Black 7 K 44500811 Bracket SMS Duct Channel 2 L 23420621 SMS Power C...

Страница 5: ... through the hole in the base and while feeding the powercord back into the base slide the upright down over the brackets on the base The electrical panel should be to the right as shown above Make sure the upright is all the way down and attach the Upright to the Base with the 5 16 18 Hex Head Bolts item C and 5 16 Flat Washer item D Replace the laminate trim panels in the SMS Upright Install the...

Страница 6: ...pencil marks and tighten the hex head keps nuts to hold them in place Do not tighten this hardware to more than 10 foot lbs of torque Doing so will cause scoring to the aluminum of the upright Install the handles item M to the bottom of the worksurface item 2 with 1 4 20 x 625 phillips head screws and 1 4 flat washers items D and E Place the worksurface on the top support brackets so that the cut ...

Страница 7: ...ful not to overtighten 10 ft lbs max Install 5 16 18 x 75 square head bolts item H 5 16 flat washer item D and 5 16 18 hex head keps nuts item J to the SMS Duct Channel Bracket item K Do not tighten this hardware Install two SMS Duct Channel Brackets to the upright by placing the heads of the square bolts into a milled cut out in the rear slot of the upright Adjust the SMS Duct Channel Brackets to...

Страница 8: ...ed in EOS ESD document S4 1 1990 Worksurfaces Resistive Characterization For specific details on grounding the bench consult EOS ESD document S6 1 1991 GROUNDING CAUTIONS 1 Ground each bench individually to ground NEVER to each other in a continuous daisy chain 2 ISOLATED ground receptacles should not be used to derive an ESD ground 3 The green wire in a standard wall duplex can be used as a groun...

Страница 9: ...IAC INDUSTRIES 895 BEACON STREET BREA CA 92821 2926 Phone 713 990 8997 Fax 714 990 0557 www iacindustries com ASSEMBLY INSTRUCTIONS REVISON 112012 SMS S2 SMART MOBILE STATION UE ...

Страница 10: ...ur during shipment Check all packages and parts for any signs of damage If damage is evident STOP and contact the carrier that delivered your order Request a freight claim inspector to document the damage and begin the freight claim process Tools required Utility knife Safety glasses and light duty protective gloves NOTE Power tools are NOT recommended unless they are equipped with a torque limiti...

Страница 11: ...3 ...

Страница 12: ...HWR502 Item Part Description Qty A 920452 Caster 4 TLCHR 1 2 13 Stem 4 B 900062 Nut 1 2 13 Zinc 4 C 900044 Bolt 5 16 18 x 750 Hex Head 4 D 900080 Washer 5 16 Flat Black 15 E 965241 SS Upright Top Cap 1 F 900230 Screw 1 4 20 x 625 Phillips Black 22 G 900068 Washer 1 4 Flat Black 22 H 900041 Bolt 5 16 18 x 750 SQHD Black 11 J 900115 Nut 5 16 18 Hex Keps Black 11 K 44500811 Bracket SMS Duct Channel 2...

Страница 13: ...ough the hole in the base and while feeding the powercord back into the base slide the upright down over the brackets on the base The electrical panel should be to the right as shown above Make sure the upright is all the way down and attach the Upright to the Base with the 5 16 18 Hex Head Bolts item C and 5 16 Flat Washer item D Replace the laminate trim panels in the SMS Upright Install the SS ...

Страница 14: ...pencil marks and tighten the hex head keps nuts to hold them in place Do not tighten this hardware to more than 10 foot lbs of torque Doing so will cause scoring to the aluminum of the upright Install the handles item M to the bottom of the worksurface item 2 with 1 4 20 x 625 phillips head screws and 1 4 flat washers items D and E Place the worksurface on the top support brackets so that the cut ...

Страница 15: ...ful not to overtighten 10 ft lbs max Install 5 16 18 x 75 square head bolts item H 5 16 flat washer item D and 5 16 18 hex head keps nuts item J to the SMS Duct Channel Bracket item K Do not tighten this hardware Install two SMS Duct Channel Brackets to the upright by placing the heads of the square bolts into a milled cut out in the rear slot of the upright Adjust the SMS Duct Channel Brackets to...

Страница 16: ... SMS Wksf Shelf Supt Right 1 3 29600412 Brkt SMS Wksf Shelf Supt Left 1 Item Part Description Qty A 900080 Washer 5 16 Flat Black 4 B 900230 Screw 1 4 20 x 625 PPH MS Black 8 C 900068 Washer 1 4 Flat Black 8 D 900041 Bolt 5 16 18 x 750 SQHD Black 4 E 900115 Nut 5 16 18 Hex Keps Black 4 SMS LOWER SHELF Assembly Drawing ...

Страница 17: ...in the top supports and secure with the 1 4 20 x 625 phillips head screws and flat washers Make small pencil marks on the uprights working height of the Worksurface and the Shelf Install the top support brackets by installing the square head bolts into the milled slots in the front nut channels of the upright Gently slide the top support brackets to the pencil marks and tighten the hex head keps n...

Страница 18: ...bed in EOS ESD document S4 1 1990 Worksurfaces Resistive Characterization For specific details on grounding the bench consult EOS ESD document S6 1 1991 GROUNDING CAUTIONS 1 Ground each bench individually to ground NEVER to each other in a continuous daisy chain 2 ISOLATED ground receptacles should not be used to derive an ESD ground 3 The green wire in a standard wall duplex can be used as a grou...

Страница 19: ...IAC INDUSTRIES 895 BEACON STREET BREA CA 92821 2926 Phone 713 990 8997 Fax 714 990 0557 www iacindustries com ASSEMBLY INSTRUCTIONS REVISON 112012 SMS S3 SMART MOBILE STATION UE ...

Страница 20: ...age can occur during shipment Check all packages and parts for any signs of damage If damage is evident STOP and contact the carrier that delivered your order Request a freight claim inspector to document the damage and begin the freight claim process Tools required Utility knife Safety glasses and light duty protective gloves NOTE Power tools are NOT recommended unless they are equipped with a to...

Страница 21: ...3 ...

Страница 22: ...C 900044 Bolt 5 16 18 x 750 Hex Head 4 D 900080 Washer 5 16 Flat Black 15 E 965241 SS Upright Top Cap 1 F 900230 Screw 1 4 20 x 625 Phillips Black 22 G 900068 Washer 1 4 Flat Black 22 H 900041 Bolt 5 16 18 x 750 SQHD Black 11 J 900115 Nut 5 16 18 Hex Keps Black 11 K 44500811 Bracket SMS Duct Channel 2 L 23420621 SMS Power Cord Wrap 1 M 900056 Nut 10 32 Hex Keps Black 2 N 900070 Washer 10 Flat Zinc...

Страница 23: ...ough the hole in the base and while feeding the powercord back into the base slide the upright down over the brackets on the base The electrical panel should be to the right as shown above Make sure the upright is all the way down and attach the Upright to the Base with the 5 16 18 Hex Head Bolts item C and 5 16 Flat Washer item D Replace the laminate trim panels in the SMS Upright Install the SS ...

Страница 24: ...pencil marks and tighten the hex head keps nuts to hold them in place Do not tighten this hardware to more than 10 foot lbs of torque Doing so will cause scoring to the aluminum of the upright Install the handles item M to the bottom of the worksurface item 2 with 1 4 20 x 625 phillips head screws and 1 4 flat washers items D and E Place the worksurface on the top support brackets so that the cut ...

Страница 25: ...ful not to overtighten 10 ft lbs max Install 5 16 18 x 75 square head bolts item H 5 16 flat washer item D and 5 16 18 hex head keps nuts item J to the SMS Duct Channel Bracket item K Do not tighten this hardware Install two SMS Duct Channel Brackets to the upright by placing the heads of the square bolts into a milled cut out in the rear slot of the upright Adjust the SMS Duct Channel Brackets to...

Страница 26: ... SMS Wksf Shelf Supt Right 1 3 29600412 Brkt SMS Wksf Shelf Supt Left 1 Item Part Description Qty A 900080 Washer 5 16 Flat Black 4 B 900230 Screw 1 4 20 x 625 PPH MS Black 8 C 900068 Washer 1 4 Flat Black 8 D 900041 Bolt 5 16 18 x 750 SQHD Black 4 E 900115 Nut 5 16 18 Hex Keps Black 4 SMS LOWER SHELF Assembly Drawing ...

Страница 27: ...in the top supports and secure with the 1 4 20 x 625 phillips head screws and flat washers Make small pencil marks on the uprights working height of the Worksurface and the Shelf Install the top support brackets by installing the square head bolts into the milled slots in the front nut channels of the upright Gently slide the top support brackets to the pencil marks and tighten the hex head keps n...

Страница 28: ...e Use the same type of Phillips head screws and flat washers to secure the rear brackets The threaded inserts for these brackets are about 15 from the front set of inserts and are about 12 1 4 apart Attach the Locker the the hanger brackets items R and S Use Phillips head screws and flat washers items N and P inside the Locker The screws go through the slots in the top of the locker and through th...

Страница 29: ...bed in EOS ESD document S4 1 1990 Worksurfaces Resistive Characterization For specific details on grounding the bench consult EOS ESD document S6 1 1991 GROUNDING CAUTIONS 1 Ground each bench individually to ground NEVER to each other in a continuous daisy chain 2 ISOLATED ground receptacles should not be used to derive an ESD ground 3 The green wire in a standard wall duplex can be used as a grou...

Страница 30: ...IAC INDUSTRIES 895 BEACON STREET BREA CA 92821 2926 Phone 713 990 8997 Fax 714 990 0557 www iacindustries com SMS S4 SMART MOBILE STATION UE REVISON 112012 ...

Страница 31: ...acking of it s products however damage can occur during shipment Check all packages and parts for any signs of damage If damage is evident STOP and contact the carrier that delivered your order Request a freight claim inspector to document the damage and begin the freight claim process Tools required Utility knife Safety glasses and light duty protective gloves NOTE Power tools are NOT recommended...

Страница 32: ...3 ...

Страница 33: ...ng Arm Mtg Plt Sub Assy 75 1 12 35000801 KBH Tray 4 91x21 625L Sub Assy SMS 1 13 35111101 CPU Holder Sub Assy SMS 1 Hardware Kit HWR504 Item Part Description Qty A 920455 Caster 4 TLCPU 1 2 13 Stem 4 B 900062 Nut 1 2 13 Zinc 4 C 900044 Bolt 5 16 18 x 750 HHW Black 4 D 900080 Washer 5 16 Flat Black 15 E 29600631 SMS Cart Handle Sub Assembly 2 F 965241 SS Upright Top Cap Painted 1 G 900230 Screw 1 4...

Страница 34: ... 900115 Nut 5 16 18 Hex Keps Black 1 S 35111201 Brkt CPU Holder Uprt MTD SMS 2 Hardware Kit HWR031 Item Part Description Qty T 900041 Bolt 5 16 18 x 750 SQHD Black 2 U 900249 Washer 750 ID 1 125 OD x 093 PLTSC 3 V 900068 Washer 1 4 Flat Black 2 W 900125 Nut 5 16 18 Hex Acorn Zinc 2 X 900056 Nut 10 32 Hex Keps Black 4 Y 900070 Washer 10 Flat Zinc 4 Z 965214 Bracket FPD Monitor Mtg Adpater 100MM 1 ...

Страница 35: ... while feeding the powercord back into the base slide the upright down over the brackets on the base The electrical panel should be to the right as shown above Make sure the upright is all the way down and attach the Upright to the Base with the 5 16 18 Hex Head Bolts item C and 5 16 Flat Washer item D Replace the laminate trim panels in the SMS Upright Install the SS Top Cap item E see page 6 Plu...

Страница 36: ...he pencil marks and tighten the hex head keps nuts to hold them in place Do not tighten this hardware to more than 10 foot lbs of torque Doing so will cause scoring to the aluminum of the upright Install the handles item M to the bottom of the worksurface item 2 with 1 4 20 x 625 phillips head screws and 1 4 flat washers items D and E Place the Worksurface item 2 on the top support brackets so tha...

Страница 37: ...es are plastic levers Pull the left lever up while pressing the right lever down This disengages the slides to allow the complete removal of the keyboard tray Once the keyboard tray is out attach the locker to the bottom of the keyboard tray using 1 4 20 screws flat washers and nuts See items d d d Do not re install the keyboard tray yet lever After the keyboard tray and locker have been attach to...

Страница 38: ...tem F 5 16 flat washer item B and 5 16 18 hex head keps nuts item G to the SMS Duct Channel Bracket item H Do not tighten this hardware Install two SMS Duct Channel Brackets to the upright by placing the heads of the square bolts into a milled cut out in the rear slot of the upright Adjust the SMS Duct Channel Brackets to be the same distance apart as the holes in the LAN Wire Management Channel i...

Страница 39: ...em 2 into the milled slots in the front nut channels of the upright Gently slide the monitor bracket item 2 to the desired height and tighten the hex head keps nuts to hold them in place Do not tighten this hardware to more than 10 foot lbs of torque Doing so will cause scoring to the aluminum of the upright See Fig B above If your monitor has a 100MM mounting hole pattern about 3 94 attach the ad...

Страница 40: ...t Do not tighten this hardware Attach the CPU Holder Brackets to the Upright see below Set at the desired height Tighten the nuts Remove the Bottom Pan from the CPU Holder Assembly Attach the top portion of the CPU Holder Assembly to the brackets mounted to the upright using 1 4 20 x 625 Philllips head screws item N Re install the Bottom Pan Bottom Pan SMS S4 CPU Holder Assembly Lower Shelf not Sh...

Страница 41: ...bed in EOS ESD document S4 1 1990 Worksurfaces Resistive Characterization For specific details on grounding the bench consult EOS ESD document S6 1 1991 GROUNDING CAUTIONS 1 Ground each bench individually to ground NEVER to each other in a continuous daisy chain 2 ISOLATED ground receptacles should not be used to derive an ESD ground 3 The green wire in a standard wall duplex can be used as a grou...

Страница 42: ...IAC INDUSTRIES 895 BEACON STREET BREA CA 92821 2926 Phone 713 990 8997 Fax 714 990 0557 www iacindustries com SMS S5 SMART MOBILE STATION UE REVISON 112012 ...

Страница 43: ...king of it s products however damage can occur during shipment Check all packages and parts for any signs of damage If damage is evident STOP and contact the carrier that delivered your order Request a freight claim inspector to document the damage and begin the freight claim process Tools required Utility knife Safety glasses and light duty protective gloves NOTE Power tools are NOT recommended u...

Страница 44: ...3 ...

Страница 45: ... Sub Assembly 1 10 38450301 SMS FPD Monitor MTG Brkt Sub Assembly 1 Hardware Kit HWR505 Item Part Description Qty A 920455 Caster 4 TLCPU 1 2 13 Stem 4 B 900062 Nut 1 2 13 Zinc 4 C 900044 Bolt 5 16 18 x 750 Hex Head 4 D 900080 Washer 5 16 Flat Black 11 E 965241 SS Upright Top Cap 1 F 900230 Screw 1 4 20 x 625 Phillips Black 16 G 900068 Washer 1 4 Flat Black 16 H 900041 Bolt 5 16 18 x 750 SQHD Blac...

Страница 46: ...900115 NUT 5 16 18 HEX KEPS BLACK 4 T 35111201 Brkt CPU Holder Uprt MTD SMS 2 Hardware Kit HWR522 Item Part Description Qty U 965214 Bracket FPD Monitor Mtg Adpater 100MM 1 V 900041 Bolt 5 16 18 x 750 SQHD Black 2 W 900080 Washer 5 16 Flat Black 2 X 900125 Nut 5 16 18 Hex Acorn Zinc 2 Y 900056 Nut 10 32 Hex Keps Black 4 Z 900070 Washer 10 Flat Zinc 4 AA 900249 Washer 750 ID 1 12 OD 093 THK Plst 4 ...

Страница 47: ... while feeding the powercord back into the base slide the upright down over the brackets on the base The electrical panel should be to the right as shown above Make sure the upright is all the way down and attach the Upright to the Base with the 5 16 18 Hex Head Bolts item C and 5 16 Flat Washer item D Replace the laminate trim panels in the SMS Upright Install the SS Top Cap item E see page 6 Plu...

Страница 48: ...pencil marks and tighten the hex head keps nuts to hold them in place Do not tighten this hardware to more than 10 foot lbs of torque Doing so will cause scoring to the aluminum of the upright Install the handles item M to the bottom of the worksurface item 2 with 1 4 20 x 625 phillips head screws and 1 4 flat washers items D and E Place the worksurface on the top support brackets so that the cut ...

Страница 49: ... align with the slots in the top of the Keyboard Tray Case item 7 Place the Keyboard Tray Case against the bottom of the worksurface Align the slots and the inserts And attach with 1 4 20x 625 PPH Screws and flat washers Items F and G SMS S5 Keyboard Tray Installation ...

Страница 50: ...tem F 5 16 flat washer item B and 5 16 18 hex head keps nuts item G to the SMS Duct Channel Bracket item H Do not tighten this hardware Install two SMS Duct Channel Brackets to the upright by placing the heads of the square bolts into a milled cut out in the rear slot of the upright Adjust the SMS Duct Channel Brackets to be the same distance apart as the holes in the LAN Wire Management Channel i...

Страница 51: ...MM Mounting Hole Pattern 2 95 For 100MM Mounting Hole Pattern 3 94 Assembly Drawing Hardware Kit HWR522 Item Part Description Qty U 965214 Bracket FPD Monitor Mtg Adpater 100MM 1 V 900041 Bolt 5 16 18 x 750 SQHD Black 2 W 900080 Washer 5 16 Flat Black 2 X 900125 Nut 5 16 18 Hex Acorn Zinc 2 Y 900056 Nut 10 32 Hex Keps Black 4 Z 900070 Washer 10 Flat Zinc 4 AA 900249 Washer 750 ID 1 12 OD 093 THK P...

Страница 52: ...is hardware to more than 10 foot lbs of torque Doing so will cause scoring to the aluminum of the upright If your monitor has a 100MM mounting hole pattern about 3 94 attach the adapter plate item A to the pivot item 1 using the 10 hex nuts and washers items E and F If the mounting hole pattern of your monitor is 75MM about 2 95 skip the previous step Place the nylon washer over the shaft of the p...

Страница 53: ...hown at left Do not tighten this hardware Attach the CPU Holder Brackets to the Upright see below Set at the desired height Tighten the nuts Remove the Bottom Pan from the CPU Holder Assembly Attach the top portion of the CPU Holder Assembly to the brackets mounted to the upright using 1 4 20 x 625 Philllips head screws item N Re install the Bottom Pan Bottom Pan SMS S5 CPU Holder Assembly ...

Страница 54: ...bed in EOS ESD document S4 1 1990 Worksurfaces Resistive Characterization For specific details on grounding the bench consult EOS ESD document S6 1 1991 GROUNDING CAUTIONS 1 Ground each bench individually to ground NEVER to each other in a continuous daisy chain 2 ISOLATED ground receptacles should not be used to derive an ESD ground 3 The green wire in a standard wall duplex can be used as a grou...

Страница 55: ...IAC INDUSTRIES 895 BEACON STREET BREA CA 92821 2926 Phone 713 990 8997 Fax 714 990 0557 www iacindustries com SMS S8 SMART MOBILE STATION UE REVISON 112012 ...

Страница 56: ...reat care in the packing of it s products however damage can occur during shipment Check all packages and parts for any signs of damage If damage is evident STOP and contact the carrier that delivered your order Request a freight claim inspector to document the damage and begin the freight claim process Tools required Utility knife Safety glasses and light duty protective gloves NOTE Power tools a...

Страница 57: ...3 ...

Страница 58: ...b Assy 6 55x14 95x14 50L 1 12 16426802 Worksurface 22D x 28L STD Shelf SMS T Mold 1 Hardware Kit HWR508 Item Part Description Qty A 920452 Caster 4 TLCHR 1 2 13 Stem 4 B 900062 Nut 1 2 13 Zinc 4 C 900044 Bolt 5 16 18 x 750 Hex Head 4 D 900080 Washer 5 16 Flat Black 11 E 965241 SS Upright Top Cap 1 F 900230 Screw 1 4 20 x 625 Phillips Black 28 G 900068 Washer 1 4 Flat Black 32 H 900041 Bolt 5 16 18...

Страница 59: ...900115 NUT 5 16 18 HEX KEPS BLACK 4 T 35111201 Brkt CPU Holder Uprt MTD SMS 2 Hardware Kit HWR522 Item Part Description Qty U 965214 Bracket FPD Monitor Mtg Adpater 100MM 1 V 900041 Bolt 5 16 18 x 750 SQHD Black 2 W 900080 Washer 5 16 Flat Black 2 X 900125 Nut 5 16 18 Hex Acorn Zinc 2 Y 900056 Nut 10 32 Hex Keps Black 4 Z 900070 Washer 10 Flat Zinc 4 AA 900249 Washer 750 ID 1 12 OD 093 THK Plst 4 ...

Страница 60: ... while feeding the powercord back into the base slide the upright down over the brackets on the base The electrical panel should be to the right as shown above Make sure the upright is all the way down and attach the Upright to the Base with the 5 16 18 Hex Head Bolts item C and 5 16 Flat Washer item D Replace the laminate trim panels in the SMS Upright Install the SS Top Cap item E see page 6 Plu...

Страница 61: ...he pencil marks and tighten the hex head keps nuts to hold them in place Do not tighten this hardware to more than 10 foot lbs of torque Doing so will cause scoring to the aluminum of the upright Install the handles item M to the bottom of the worksurface item 2 with 1 4 20 x 625 phillips head screws and 1 4 flat washers items D and E Place the Worksurface item 2 on the top support brackets so tha...

Страница 62: ... align with the slots in the top of the Keyboard Tray Case item 7 Place the Keyboard Tray Case against the bottom of the worksurface Align the slots and the inserts And attach with 1 4 20x 625 PPH Screws and flat washers Items F and G SMS S8 Keyboard Tray Installation ...

Страница 63: ... the keyboard tray assembly item 7 Using nuts and washers Items G and R on the inside on the keyboard tray and screws and washers from Items F and G inside of the drawer attach the drawer to the bottom of the keyboard tray No brackets are necessary SMS S8 Drawer to Keyboard Tray Installation ...

Страница 64: ...tem F 5 16 flat washer item B and 5 16 18 hex head keps nuts item G to the SMS Duct Channel Bracket item H Do not tighten this hardware Install two SMS Duct Channel Brackets to the upright by placing the heads of the square bolts into a milled cut out in the rear slot of the upright Adjust the SMS Duct Channel Brackets to be the same distance apart as the holes in the LAN Wire Management Channel i...

Страница 65: ...MM Mounting Hole Pattern 2 95 For 100MM Mounting Hole Pattern 3 94 Assembly Drawing Hardware Kit HWR522 Item Part Description Qty U 965214 Bracket FPD Monitor Mtg Adpater 100MM 1 V 900041 Bolt 5 16 18 x 750 SQHD Black 2 W 900080 Washer 5 16 Flat Black 2 X 900125 Nut 5 16 18 Hex Acorn Zinc 2 Y 900056 Nut 10 32 Hex Keps Black 4 Z 900070 Washer 10 Flat Zinc 4 AA 900249 Washer 750 ID 1 12 OD 093 THK P...

Страница 66: ...his hardware to more than 10 foot lbs of torque Doing so will cause scoring to the aluminum of the upright If your monitor has a 100MM mounting hole pattern about 3 94 attach the adapter plate item A to the pivot item 1 using the 10 hex nuts and washers items E and F If the mounting hole pattern of your monitor is 75MM about 2 95 skip the previous step Place the nylon washer over the shaft of the ...

Страница 67: ...hown at left Do not tighten this hardware Attach the CPU Holder Brackets to the Upright see below Set at the desired height Tighten the nuts Remove the Bottom Pan from the CPU Holder Assembly Attach the top portion of the CPU Holder Assembly to the brackets mounted to the upright using 1 4 20 x 625 Philllips head screws item N Re install the Bottom Pan Bottom Pan SMS S8 CPU Holder Assembly ...

Страница 68: ...bed in EOS ESD document S4 1 1990 Worksurfaces Resistive Characterization For specific details on grounding the bench consult EOS ESD document S6 1 1991 GROUNDING CAUTIONS 1 Ground each bench individually to ground NEVER to each other in a continuous daisy chain 2 ISOLATED ground receptacles should not be used to derive an ESD ground 3 The green wire in a standard wall duplex can be used as a grou...

Отзывы: