7
I
nstall 5/16-18 x .75 square head bolts (item F),
5/16 flat washer (item B), and 5/16-18 hex head
keps nuts (item G) to the top support brackets for
the worksurface and the shelf (items 2 and 3) as
shown .
Do not tighten this hardware.
Make small pencil marks on the uprights
working height of the Worksurface and the Shelf.
Install the top support brackets by installing the
square head bolts into the milled slots in the front
nut channels of the upright. Gently slide the top
support brackets to the pencil marks and tighten
the hex head keps nuts to hold them in place. Do
not tighten this hardware to more than 10 foot lbs
of torque. Doing so will cause scoring to the
aluminum of the upright.
I
nstall the handles (item M) to the bottom of the worksurface
(item 2) with 1/4-20 x .625 phillips head screws and 1/4 flat
washers (items D and E).
Place the Worksurface (item 2) on the top support brackets so that the cut out fits around the upright. Line up the threaded
inserts in the bottom of the worksurface with the holes in the top supports and secure with the 1/4-20 x .625 phillips head
screws and flat washers. Repeat the process with the Shelf (item 6).
SMS S4 Worksurface and Shelf Installation