7
Install 5/16-18 x .75 square head bolts (item H), 5/16 flat
washer (item D), and 5/16-18 hex head keps nuts (item J)
to the cord wrap bracket (item L). Do not tighten this
hardware.
Install the cord wrap bracket to the upright by placing the
head of the square bolt into a milled cut out in the rear slot
of the upright (if you want the wrap in the rear), or in the
front slot (if you want the wrap to the front). Adjust the
cord wrap bracket to the desired height, and tighten the
nut....being careful not to overtighten (10 ft lbs max).
Install 5/16-18 x .75 square head bolts (item H), 5/16 flat
washer (item D), and 5/16-18 hex head keps nuts (item J)
to the SMS Duct Channel Bracket (item K). Do not tighten
this hardware.
Install two SMS Duct Channel Brackets to the upright by
placing the heads of the square bolts into a milled cut out in
the rear slot of the upright . Adjust the SMS Duct Channel
Brackets to be the same distance apart as the holes in the
LAN Wire Management Channel (item6), and tighten the
nuts. Place the Channel over the studs in the two Duct
Channel Brackets and secure with #10 Hex nuts and #10 flat
washers (items M and N).
SMS CORD WRAP BARCKET AND CORD MANAGEMENT CHANNEL