—
Tightly seal the floor end of the tube with the
gage to prevent mortar from entering the tube.
— Fix the sealed end of the tube between the cable
loops at 50–60 cm from the wall, and fix it between
assembly tape lugs.
— Bring the tube from the service box or thermostat
location to the floor (bending radius of the tube
shall be no less than 5 cm). The end of the tube with
the gage inside shall be on the floor, 50–60 cm from
the wall, between the loops of the heating cable.
We call your attention to the fact that the tube end
with the connecting wire shall reach the service box
or thermostat, otherwise you will have to break the
floor or wall to replace the gage.
J
Bring the mounting cable into the service box or to
the thermostat and fill in the wall groove with mor
tar.
J
Install the thermostat and service box and make all
the electrical connections. Connect the thermostat
while power is switched off!
J
Check for damages of the heating section after it
has been installed. You will need to measure heating
section resistance between insulated wires of the
mounting cable. It shall correspond to the value
stated in the certificate of the heating section. After
that connect wires of the mounting cable in the insu
lation and measure resistance between them and a
copper conductor without insulation. This value
www.iwarm.com
Spooled Underfloor Heating Kit
24
Содержание Spooled Kit
Страница 1: ...INSTALLATION MANUAL ...
Страница 38: ...Spooled Heating Kit ...