MY23I0a - 42_1.0_29.08.2023
187
Inspection and maintenance
8
Inspection and maintenance
8.1
Initial inspection
Vibrations produced while riding can cause
screws and springs that were tightened during
pedelec manufacture to settle or come loose.
Arrange an appointment for the initial
inspection directly when purchasing the
pedelec.
Have the initial inspection entered and
stamped in the maintenance book.
8.2
Major inspection
You must have your specialist dealer perform a
major inspection every six months as a minimum.
This is the only way to ensure that the pedelec
remains safe and fully functional.
The tasks require technical expertise, special
tools and special lubricants. The pedelec may
become damaged if the stipulated major
inspection and procedures are not carried out.
This is why only specialist dealers may carry out
the major inspection.
Contact your specialist dealer and arrange an
appointment.
Enter and stamp major inspection tasks in the
maintenance book.
8.3
Component-specific
maintenance
High-quality components require extra
maintenance. The tasks require technical
expertise, special tools and special lubricants.
The pedelec may become damaged if the
stipulated maintenance intervals and procedures
are not carried out. This is why only specialist
dealers may carry out maintenance.
Correct maintenance on the fork not only
guarantees a long service life, but also ensures
optimal performance.
Each maintenance interval shows the maximum
cycling hours for the required type of maintenance
that the component manufacturer recommends.
Optimise performance with shorter
maintenance intervals, depending on use,
terrain and environmental conditions.
After 200 km or 4 weeks after purchase
Carrying out the initial inspection, see Section
8.4.
every six months
Perform major inspection.
Enter any components with extra
maintenance requirements with their
corresponding maintenance intervals into the
maintenance book when the pedelec is
purchased.
Inform the buyer of the additional
maintenance schedule.
Enter and stamp maintenance tasks in the
maintenance book.
Содержание E5 ZR F
Страница 231: ...MY23I0a 42_1 0_29 08 2023 231 Documents Notes...
Страница 242: ...MY23I0a 42_1 0_29 08 2023 242 Documents 11 4 Charger operating instructions ABCDE...
Страница 243: ...MY23I0a 42_1 0_29 08 2023 243 Documents F 4A Charger DCG F H A I A J...
Страница 244: ...MY23I0a 42_1 0_29 08 2023 244 Documents F A I A J DCG F H...
Страница 245: ...MY23I0a 42_1 0_29 08 2023 245 Documents F DCG F H A I A J...