42
MAXPRO200
Instruction Manual 807700 Revision 1
Installation
Placement of system components
•
Place all system components in position prior to making electrical, gas, and interface connections.
Use the diagram in this section for component-placement guidelines.
•
Ground all system components to earth. See
Recommended grounding and shielding practices
page 44 for details.
•
To prevent leaks in the system, tighten all gas connections as shown below.
Torque specifications
Gas or water hose size
kgf-cm
lbf-in
lbf-ft
Up to 10 mm (3/8 in)
8.9–9.8
75–85
6.25–7
12 mm (1/2 in)
41.5–55
360–480
30–40
Содержание MAXPRO200
Страница 1: ...MAXPRO200 Instruction Manual 807700 Revision 1 ...
Страница 3: ...MAXPRO200 Instruction Manual 807700 Revision 1 English March 2013 Hypertherm Inc Hanover NH 03755 USA ...
Страница 26: ...22 MAXPRO200 Instruction Manual 807700 Revision 1 Safety ...
Страница 34: ...30 MAXPRO200 Instruction Manual 807700 Revision 1 Product Stewardship ...
Страница 38: ...34 MAXPRO200 Instruction Manual 807700 Revision 1 Specifications ...
Страница 88: ...84 MAXPRO200 Instruction Manual 807700 Revision 1 Operation Side gouging Side gouge Weaving gouge ...