Performance and Safety Rules
4-
Any M2 Series setup requiring an approved, angled or non-linear confi guration achieved
with a forward/back extension or a swivel bridge
must have mast ties. In addition,
mast ties must be installed following the appropriate schedule for the installation
of tie levels
.
5-
Any M2 Series setup requiring the use of additional, approved accessories and equipment
such as a hoist and hoist support structure specifi cally manufactured to be used on an
M2 Series installation, weather protection or an approved planking confi guration wider
than the standard four planks
must have mast ties. In addition, mast ties must be
installed following the appropriate schedule for the installation of tie levels
.
6-
It
is
mandatory
to refer to the
Mast Tie Schedule
table on p. 70 of the
Masts and Mast Ties
section and to the
Load Capacities
section on p. 80
before the installation
of
any
M2 Series
confi guration.
7-
Establish the distance between the mast climbing work platform system and the structure
or wall, taking into account the length of plank outriggers, as well as curvatures, balconies,
columns, trees, telephone wires, electrical lines, etc.
8-
Refer to and follow local regulations governing distances between the mast climbing work
platform system and electrical lines. As a reference, North American regulations generally
recommend keeping a safe distance of at least 10' (3 m) from overhead power lines
carrying 50,000 volts or less.
9-
Make sure the ground or support surface capacity meets with values included in the
Minimum Bearing Surface Capacities
table herein (fig. 1.18, p. 15). Soil compacting,
cribbing or shoring can increase bearing capacity.
10-
Never modify the mast climbing work platform system or use substitute factory parts.
This could adversely affect worker safety, unit performance and void the warranty. In
addition, this could lead to serious injury or death.
11-
The M2 Series motorized unit
must not be used
with any equipment or any accessories
not specifically manufactured and rated by Hydro Mobile to be used with M2 Series
motorized units. For the use and installation of any such equipment or accessories,
contact the distributor/service center or the Hydro Mobile technical support team.
12-
Never use the motorized unit in a enclosed space due to carbon monoxide emissions
or in a place where explosives are stored. It is recommended to use an electrically-powered
motorized unit as an alternative.
13-
Each M2 Series motorized unit must be equipped with an appropriate fi re extinguisher
(not supplied). Use the bracket supplied with the motorized unit to hang the fire
extinguisher in a readily accessible location (fi g. 1.1, p. 8).
14-
It is recommended not to smoke on the platform.
15-
Planks used for planking must be scaffold graded (SPF), in good condition and meet
local
regulations.
16- IMPORTANT
: It is strongly recommended not to use equipment that may generate
excessive vibrations or reactions on Hydro Mobile platforms.
17-
Workers exposed to potential hazards must always wear proper personal protection
equipment (PPE) such as a helmet, safety boots, a fall arrest harness, etc., as prescribed
by local regulations. In all cases where workers are exposed to fall hazards, fall protection
is required. Installation of all the necessary guardrails is
mandatory
.
18-
The M2 Series motorized unit must only be used on a mast whose height does not exceed
250' (76 m).
19-
To ensure work effi ciency, maintain an adequate equipment and parts inventory on the
job site. Keep equipment in good condition.
20-
Inspection and maintenance operations must be carried out effi ciently and in a timely manner.
Daily inspections and their related operations must be performed by a
qualifi ed user/operator
every day or before every working shift. Frequent and annual inspections and their related
operations must be carried out by a
qualifi ed technician.
Refer to the
Transport, Storage and
Maintenance
section on p. 120 for more information on inspection and maintenance
requirements for M2 Series motorized units and their accessories.
21-
After installation, mark off limit areas of the system using fencing, barriers, warning tape
and note emergency phone numbers (fi re and police dept.) for quick reference.
Prepare
an emergency evacuation plan that is specifi c to the job site and is in accordance
with local regulations.
22- Never load bridges or motorized units beyond their rated capacities
. Overloading
may bring damages to equipment or cause the installation to become unbalanced, leading
to serious injury or death.