55
fi g. 3.48
fi g. 3.49
A
C
A
B
B
C
D
D
CW
CW
3 - B
RIDGES
Outside corner setup
Inside corner setup
Loads applied to
the bearing bridge
must be
evenly
distributed
Overlap area
Location
of “corner”
overlap
UM
MU
A
Cantilever bridge
B
Bearing bridge
C
Additional
6’ (1,8 m) bridge
D
Cantilever on
corner unit
MU
Motorized unit
Installation of the 6' (1,8 m) bridge
3-
On the corner end of the motorized unit where the bearing bridge will be overlapped,
attach a 6' (1,8 m) bridge
to the motorized unit
to provide support for the bearing
bridge structure (see “C” in fi g. 3.48 and fi g. 3.49). Refer to the installation instructions
for a cantilever bridge on p. 44 of this section.
Installation of a cantilever bridge
Bridge Setups
Alternate Bridge Confi gurations
Inside / Outside Corner Bearing Bridge Setup
(requires the use of an optional 6' (1,8 m) bridge)
4-
Install a cantilever bridge (see “D” in fi g. 3.48 and fi g. 3.49) on the “corner” motorized unit
on the side opposite to where the bearing bridge structure will be installed.
Counterweight
Loads applied to
the bearing bridge
must be
evenly
distributed
Counterweight
Location
of “corner”
overlap
Complete the installation of the bearing bridge structure
5-
Carefully lower the bearing bridge structure on the corner motorized unit and on the
6' (1,8 m) bridge installed on the other unit (“C” in fi g. 3.48 and fi g. 3.49, making sure
the overlap is appropriate at both ends. The edge of the bearing bridge must be in
line with the edge of the 6' (1,8 m bridge on the “corner” unit, creating a 12" (30,5 cm)
overlap on the corner of unit (see fi g. 3.47, p. 54).
6-
Make sure all safety chains are properly installed and secured.
7-
Once the bearing bridge structure and the cantilever bridges are installed, apply the
appropriate counterweight on the unit supporting the angled bearing bridge structure.
The counterweight must be set between the mast section and the edge of the
motorized unit (see “CW” in fi g. 3.48 and fi g. 3.49). Refer to p. 89 and p. 90 of the
Load
Capacities
section for counterweight requirements and load capacities for an inside
or outside corner bearing bridge confi guration.
8-
Proceed with the installation steps as described in the method of installation
appropriate for the confi guration. For more information about methods of installation,
refer to p. 18 of the
Motorized Unit
section.
CORNER
MU
CORNER
MU